Description
The Villages Community Development Districts is seeking a qualified contractor to perform the PLC Replacement Program Phase 3. The project includes engineering and submittals, material procurement, factory assembly, PLC programming, hardware and software factory acceptance testing, replacement of existing PLC panels, electrical conduit and cable installation, fiber optic cable, field testing, commissioning, training, and complete as-built drawings. The contractor must have at least 8 years of experience performing PLC/PAC control panel upgrades or installations and 5 years of experience in the water and wastewater industry. The contractor must also have a UL certified panel shop and maintain field service offices within a 2.5-hour driving distance from the District.
• The project requires the replacement of existing PLC panels with new ones
• The contractor must have experience with Allen-Bradley platforms, including CompactLogix and MicroLogix
• The contractor must provide training to District personnel on the new PLC system
• The contractor must provide complete as-built drawings and documentation upon completion of the project
• The project has a mandatory pre-bid conference and site visit
• The contractor must have a minimum of $1,000,000 in commercial general liability insurance and $1,000,000 in business automobile liability insurance
Attached files
The solicitation documents live at the source — open the bid source above to download them.