Description
The City of South Burlington invites bids for the Kennedy Drive Pond 7 Stormwater Improvements Project. The project includes the installation of a diversion structure, upsizing existing drainage pipes and catch basins, installation of a pre-treatment device, and expanding and retrofitting an existing detention basin into a gravel wetland.
• Installation of a diversion structure
• Upsizing existing drainage pipes and catch basins
• Installation of a pre-treatment device
• Expanding and retrofitting an existing detention basin into a gravel wetland
• Installation of subsurface material, underdrains, and outlet control structure
Attached files
The solicitation documents live at the source — open the bid source above to download them.