The project involves the demolition of existing bridge structures, construction of new bridges over the Boise River and Ridenbaugh Canal, construction of a single-lane roundabout at the intersection of Eckert Road and Boise Avenue, and reconstruction of roadway approaches. Additional improvements include construction of a multi-use pathway, a Greenbelt underpass, and modifications to the Barber Park driveway access. The project also includes roadway excavation and embankment, pavement construction, curb, gutter, sidewalks, retaining walls, drainage improvements, irrigation and utility adjustments, traffic control, permanent signing and pavement markings, illumination, landscaping, erosion and sediment control, environmental protection measures, and all other work necessary to complete the project in accordance with plans and specifications.
• Demolition of existing bridge structures
• Construction of new bridges over the Boise River and Ridenbaugh Canal
• Construction of a single-lane roundabout at the intersection of Eckert Road and Boise Avenue
• Reconstruction of roadway approaches
• Construction of a multi-use pathway
• Construction of a Greenbelt underpass
• Modifications to the Barber Park driveway access
• Roadway excavation and embankment
• Pavement construction
• Curb, gutter, sidewalks, retaining walls, drainage improvements
• Irrigation and utility adjustments
• Traffic control, permanent signing and pavement markings, illumination, landscaping
• Erosion and sediment control, environmental protection measures