The City of Boise is seeking a qualified contractor to perform the first phase of reconstruction and rehabilitation of Airport Way at the Boise Airport, including extensive work on the adjacent elevated roadway. The solicitation is a formal bid (FB) requiring electronic submission via JAGGAER, a 5 % bid security, and a sealed‑until bid opening on 12 Nov 2026. The scope is broken into three schedules covering traffic‑control marking, elevated‑roadway concrete and bridge work, and extensive roadway demolition, paving, and utility upgrades. Key deliverables include concrete waterproofing, PPC overlays, bridge‑deck removal, channelizer removal, pavement marking, floodlights, temporary traffic control, and various contingency allowances.
• Schedule I – Elevated Roadway Repairs: concrete waterproofing, bridge‑deck removal, bridge‑deck repairs, floodlights, signage, and a $729,115 contingency.
• Schedule II – Airport Way Roadway Repairs: demolition of existing pavement, curb & gutter, installation of new asphalt, concrete sidewalks, drainage, and a $85,750 contingency.
• Service Line Items – Traffic‑control marking, channelizers, barricades, flaggers, painted/thermoplastic markings, and related labor measured in man‑hours.
The bid package includes an IFB Project Manual, detailed plans, terms & conditions, and a sample contract. Bidders must submit a signed electronic bid, bid bond, licensing/subcontractor disclosures, and any equal‑or‑equivalent product requests before the deadline.