Description
The City of Cedar Rapids is seeking a contractor to design, install, operate, and maintain solar photovoltaic (PV) and battery energy storage systems (BESS) at several city properties. The selected contractor will enter into a 20-year power purchase agreement (PPA) with the city. The contractor will be responsible for providing all necessary equipment, materials, and labor to install and maintain the PV and BESS systems. The city is seeking a firm fixed-price proposal that includes all costs associated with the design, installation, operation, and maintenance of the systems. The proposal should include a technical submission, financial proposal, and implementation plan.
Key aspects of the project include:
• Design and installation of PV and BESS systems at city properties
• Operation and maintenance of the systems for 20 years
• Provision of all necessary equipment, materials, and labor
• Compliance with all relevant codes, standards, and regulations
• Performance guarantees for the systems
• Regular monitoring and reporting of system performance
Attached files
The solicitation documents live at the source — open the bid source above to download them.