This project requires a full demolition, relocation, and upgrade of a municipal sanitary sewage pump station (Station 0812) at 8401 SW 107th Avenue, Miami, FL. The contractor must provide all civil, mechanical, and electrical work—including excavation, construction of wet‑well/dry‑well structures, installation of two 15‑HP submersible pumps, control and telemetry systems, temporary bypass pumping, roadwork, and site restoration—while complying with Miami‑Dade County licensing, insurance, and experience requirements. The contract is valued at approximately $1.8 M and must be completed within 280 calendar days.
• Demolition of existing pump station, removal of utilities, and disposal of debris.
• Excavation, structural construction (wet‑well, dry‑well, valve vault, manhole), installation of pumps, control panels, SCADA/RTU equipment, and related electrical work.
• Completion of civil works (asphalt driveway, landscaping, site restoration) and full commissioning/testing of the new pump station.