Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sid…

City of Fresno·California

Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades and Herndon EB Left-Turn Extension

Closes 11/10/2026$2M – $3MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Fresno is seeking qualified contractors to execute the “Pave More Now” Package S‑2.1, which includes sidewalk construction, street‑light installation, left‑turn lane extension, ADA curb‑ramp and high‑visibility crosswalk installation, and upgraded traffic‑signal phasing with video detection. The project budget is approximately $2.493 million, and all work must be completed within 80 working days after the Notice to Proceed. Bidders must hold a valid California Class A contractor’s license, provide a 10 % bid deposit, and furnish 100 % performance and payment bonds. Additional requirements include compliance with prevailing‑wage rules, the City’s Community Workforce Agreement, and the preparation of SWPPP/FDCP plans. The bid will be opened publicly on November 10, 2026, after electronic submission. • Scope: Sidewalk & street‑light upgrades on Bullard Ave (PW01136); left‑turn lane extension on Herndon Ave (PW01189); traffic‑signal enhancements, ADA ramps, crosswalks, video detection (PW01145). • Financials: $2.493 M construction allocation; 10 % bid deposit; 100 % performance & payment bonds; $1,000/day liquidated damages for late completion. • Compliance: Class A CA contractor license, prevailing‑wage (Resolution 82‑297), Community Workforce Agreement, SWPPP/FDCP, County encroachment permit, mandatory public outreach (door‑hangings, project‑branding signage).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Veronica Brandon(Purchasing Specialist)

[email protected]

(559) 621‑1131

Key dates

Opened
10/9/2026
Pre-bid meeting
10/22/2026
Closes
11/10/2026
Duration
80 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
12700465

Budget estimate

$2,000,000 – $3,000,000

The solicitation lists a construction allocation of $2,493,000, which represents the maximum budget the City expects to spend. Accounting for typical contractor margins (≈10‑15 %), risk allowances, and potential change‑order values, a realistic award value would fall between $2.0 M and $3.0 M. Factors influencing the range include the exact final design, any unforeseen site conditions, and the level of subcontracting required for specialty trades (electrical, ITS, traffic‑control).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fresno·California

Top match · 91%

City of Fresno Pave More Now - Bid Package B-3

Closes 11/3/2026Opened 10/6/2026

City of Fresno·California

91% match

City of Fresno Pave More Now - Bid Package S-1.1

Closes 11/3/2026Opened 10/6/2026

City of Fresno·California

87% match

REBID - PAVE MORE NOW Bid Package S-2.1 Bullard & Forkner Traffic Signal Project

Closes 10/27/2026Opened 10/9/2026

LA Public Works Engineering Bureau·California

83% match

SIDEWALK REPAIR PROGRAM PACKAGE NO. 89 (LA 28)

Closes 10/14/2026Opened 9/9/2026

City of Palmdale·California

82% match

HSIP Cycle 11 – Citywide Signal Modernization Project

Closes 10/13/2026Opened 9/1/2026

The City of Anaheim·California

82% match

Install Rectangular Rapid Flashing Beacons (RRFB) at 14 High-Pedestrian -Volume Uncontrolled Crosswalk Locations

Closes 10/15/2026Opened 9/24/2026

City of Rancho Cordova·California

82% match

2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

City of San Diego·California

82% match

32nd St and Market St Intersection Upgrade

Closes 10/14/2026Opened 9/11/2026

LA Public Works Engineering Bureau·California

82% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

LA Public Works Street Lighting Bureau·California

82% match

PACIFIC PALISADES STREET LIGHT POLE REPLACEMENT - PHASE 1

Closes 10/14/2026Opened 9/2/2026

California Department of Transportation·California

82% match

Construct sidewalk with fence, adjust and replace DIs.

Closes 10/22/2026Opened 9/21/2026

City of Riverside·California

82% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Modesto, CA·California

81% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 10/27/2026Opened 9/1/2026

City of Evanston·Illinois

81% match

BID 26-45 Traffic Signal Improvements Project

Closes 10/20/2026Opened 8/27/2026

City of Bakersfield·California

81% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 10/29/2026Opened 10/8/2026

California Department of Transportation·California

81% match

Bridge work, erosion control, and lighting system.

Closes 11/5/2026Opened 10/5/2026

City of Dania Beach·Florida

81% match

Sidewalk Rehabilitation Phase II

Closes 10/19/2026Opened 9/18/2026

City of Tracy·California

81% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026

City of San Mateo·California

81% match

Peninsula Avenue and Delaware Street Traffic Signal Modification Project

Closes 10/15/2026Opened 9/17/2026

Georgia City of Atlanta·Georgia

81% match

IFB/CON/DOT/2602-1260140, 1098 Boulevard Pedestrian Improvements

Closes 10/23/2026Opened 9/23/2026

City of Santa Barbara·California

81% match

Pavement Marking and Striping

Closes 10/15/2026Opened 9/21/2026

Santa Clara Valley Transportation Authority·California

81% match

Pre-Qualification: US 101 Express Lanes Phase 5

Closes 10/29/2026Opened 8/3/2026

City of Philadelphia·Pennsylvania

81% match

PW Prequalification for Bid -3008 Crescentville Road Signals and Pedestrian Improvements

Closes 10/29/2026Opened 10/9/2026

Town of Westwood·Massachusetts

81% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Newberry, Florida·Florida

80% match

Invitation to Bid 2026-03, City of Newberry SW 254th Street Extension from SW 7th Avenue to SW 10th Avenue

Closes 10/27/2026Opened 9/21/2026