Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Kansas
  4. ›Construction
  5. ›Bickle Schmidt Sports Complex Poured-In-Place Surfacing

City of Hays·Kansas

Bickle Schmidt Sports Complex Poured-In-Place Surfacing

Closes 11/3/2026$150k – $300kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Hays is soliciting sealed bids to remove the existing poured‑in‑place playground surfacing at the Bickle Schmidt Sports Complex and install new, color‑matched, fall‑zone surfacing. The work includes demolition of the current surface, preparation of the base, installation of a new 8‑ft fall‑height surfacing system over an approximately 55’ × 55’ area, protection of existing concrete, turf, and playground equipment, and coordination with a new shade structure that will be installed between December 2026 and March 2027. The contractor must be fully qualified, provide all labor, materials, equipment, warranties, and obtain any required permits (provided by the city). A site visit is strongly encouraged but not mandatory. Bids are due by 3:00 PM on 3 Nov 2026; the installation window is slated for 1 Apr 2027 – 1 Jun 2027. • Removal of existing poured‑in‑place surfacing (≈55’ × 55’) • Installation of new poured‑in‑place surfacing with 8 ft fall height, black/green color preferred • Protection of existing concrete, turf, and playground equipment during work • Coordination with shade‑structure installation (Dec 2026 – Mar 2027) • Provide all materials, labor, equipment, warranties, and required permits (city‑provided) • Submit sealed bid package with itemized costs; no bid fee required • Insurance minimum $1,000,000 per accident; compliance with Kansas anti‑discrimination statutes

Attached files

Contact

Jeff Boyle(Director of Parks)

[email protected]

(785) 628-7375

Key dates

Opened
10/15/2026
Closes
11/3/2026
Duration
2 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238990

Budget estimate

$150,000 – $300,000

The solicitation does not disclose a budget. Based on typical municipal playground resurfacing projects of roughly 3,000 sq ft (55 ft × 55 ft) with demolition, base preparation, and premium poured‑in‑place material, total costs usually range from $120 to $250 per square foot. That yields an estimated contract value between $150,000 and $300,000, depending on material choice, site conditions, and warranty requirements. Factors influencing the final amount include the selected color system, any unforeseen base‑material remediation, and the need for protective measures for existing concrete and equipment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Hays·Kansas

Top match · 89%

Bickle-Schmidt Sports Complex Playground Shelter

Closes 10/27/2026Opened 9/24/2026

Davenport Community Schools·Iowa

84% match

Brady Stadium Turf Replacement Project

Closes 10/29/2026Opened 10/5/2026

Douglas County·Nebraska

83% match

Lake James Park Renovation

Closes 10/28/2026Opened 10/7/2026

Douglas County·Nebraska

82% match

Lake James Park Renovation

Closes 10/28/2026Opened 10/7/2026

City of Fort Morgan·Colorado

82% match

Shingled Roof Replacements

Closes 10/27/2026Opened 10/6/2026

Massachusetts East Longmeadow Public Schools·Massachusetts

82% match

Bid Outdoor Non-Elevated Bleachers Delivery and Installation Project

Closes 10/26/2026Opened 10/1/2026

Douglas County·Nebraska

82% match

Motto McLean Ice Area Parking Lot Renovation 2026

Closes 10/21/2026Opened 10/7/2026

Nevada Government·Nevada

82% match

Carson City Centennial Park Drainage Project

Closes 10/21/2026Opened 9/30/2026

City of Lauderhill·Florida

82% match

GO BOND PROJECT: MUNICIPAL PARKS PLAYGROUND REPLACEMENT - CITY OF LAUDERHILL PARKS

Closes 11/9/2026Opened 10/2/2026

Greenville County Schools·South Carolina

81% match

Concrete Installation - Blue Ridge High

Closes 10/20/2026Opened 9/29/2026

San Gabriel Unified School District·California

81% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

City of Asheville·North Carolina

81% match

Request for Bids for Tempie Avery Playground Surface Repairs

Closes 10/20/2026Opened 9/30/2026

City of St. Joseph·Missouri

81% match

Northside Splashpad

Closes 10/29/2026Opened 10/2/2026

City of Goose Creek·South Carolina

81% match

Dogwood Park Basketball Court

Closes 10/30/2026Opened 10/7/2026

City of St. Joseph·Missouri

81% match

Northside Splashpad

Closes 10/29/2026Opened 10/2/2026

Georgia Columbus Consolidated Government·Georgia

81% match

RFB No. 27-0011 Tennis Court Resurfacing at Lakebottom Park and Double Churches Park

Closes 10/28/2026Opened 9/1/2026

City of Columbia·Missouri

81% match

North Village Park - Playground, Surfacing, and Shade

Closes 10/30/2026Opened 10/9/2026

Columbus Consolidated Government·Georgia

81% match

Tennis Court Resurfacing at Lakebottom Park and Double Churches Park

Closes 10/28/2026Opened 9/1/2026

City of Delphos·Kansas

81% match

A Place To Play - Park Improvements - Delphos, KS

Closes 11/2/2026Opened 9/28/2026

Michigan Board of Education of Royal Oak Schools·Michigan

81% match

ROYAL OAK HIGH SCHOOL PRACTICE FIELD RENOVATIONS

Closes 10/23/2026Opened 10/9/2026

Columbus Consolidated Government·Georgia

81% match

Tennis Court Resurfacing at Lakebottom Park and Double Churches Park

Closes 10/28/2026Opened 9/1/2026

North Carolina City of Asheville·North Carolina

81% match

Tempie Avery Playground Surface Repairs

Closes 10/20/2026Opened 9/30/2026

City of Cleveland Tennessee·Tennessee

81% match

Bower Lane Sidewalk Project

Closes 10/20/2026Opened 9/28/2026

City of Cedar Rapids·Iowa

81% match

Install New Roof Curbs on 4 City Facilities

Closes 10/20/2026Opened 10/6/2026

Davenport Community Schools·Iowa

81% match

North High School Tennis Courts Resurface Project

Closes 10/29/2026Opened 10/1/2026