The VA Medical Center in Tomah, Wisconsin is soliciting a contractor to replace all castâiron steam, hotâwater, and related pipe fittings throughout the facility. The work includes removal of existing castâiron components, installation of new steel or ductileâiron fittings, valves, steam traps, pressureâreducing and safety valves, and associated piping that operate at âĽ15 psig and >257 °F. The contractor must provide all labor, materials, equipment, qualified supervision, and comply with extensive safety, security, environmental, and phasing requirements to keep the hospital operational 24/7. Multiple building phases (B415, B400, B401, etc.) are outlined, with optional alternates that exclude specific structures. The scope also covers demolition, waste management, protection of existing systems, testing, commissioning, asâbuilt documentation, and a oneâyear construction warranty with followâup inspections.
⢠Replace castâiron steam and hotâwater fittings across an entire VA hospital campus
⢠Provide new steel/ductileâiron components, valves, traps, and pressureâcontrol devices
⢠Perform work in phased sequences to maintain continuous hospital operations
⢠Manage hazardous material abatement, site security, utility interruptions, and waste disposal
⢠Deliver asâbuilt drawings, warranty management plan, and conduct required testing and inspections.