Description
The Washoe Hydroelectric Powerhouse Improvements project is seeking prequalification applications from major equipment suppliers for the turbine and generator system. The system includes the turbine, generator, lubrication system, neutral/grounding transformer, 5kV line-up, and protective relays. The project utilizes a run-of-the-river hydroelectric system with up to 86 FT of head and 400 CFS of flow to generate 2.8MW. Supplier experience with hydroelectric systems of similar size and configuration is favorable.
• The project is part of a hydroelectric system that generates 2.8MW.
• The system includes a turbine, generator, lubrication system, and other associated features of work.
• Turbine isolation valves, controls, and SCADA for the hydroelectric system will be pursued as bid options.
• The selected supplier may need to provide control descriptions and support for the owner to complete system programming.
Attached files
The solicitation documents live at the source — open the bid source above to download them.