The City of Chandler is soliciting bids for a comprehensive intersection upgrade at Ray Road and Dobson Road. The project includes roadway widening, new dual left‑turn lanes, bike lanes, a landscaped median, curb and gutter, sidewalks, ADA‑compliant ramps, traffic‑signal replacement with LED lighting, extensive storm‑drain and irrigation improvements, and utility relocations. The contract is a unit‑price, fixed‑price agreement with a 700‑day performance period and requires at least 50 % self‑performance.
• Scope: Heavy civil construction (roadway, pavement, curb, sidewalk), traffic‑signal and lighting upgrades, storm‑drain and irrigation systems, utility relocation, and landscape/planting work.
• Budget: Engineer’s estimate $14 M‑$18 M plus $2.1 M in allowances; bid bond 10 % and performance bond 100 % of award.
• Requirements: Valid Arizona contractor’s license, 10 % bid bond, 100 % performance bond, compliance with Buy‑America, forced‑labor ban, EEO, and extensive inspection/documentation schedule.
• Timeline: Mandatory pre‑bid conference September 16 2026; questions due September 18 2026; revised bid submission deadline November 19 2026 3 PM.
• Duration: 700 consecutive calendar days (substantial completion by day 640, final acceptance by day 700).