The Municipality of Anchorage is seeking a qualified architectural/engineering firm to provide full design‑service support for a new downtown transit center in Anchorage, Alaska. The work encompasses pre‑design investigations, design‑study memorandum, environmental documentation, FTA equity analysis, public outreach coordination, utility and permit coordination, detailed preliminary and final design, construction‑document preparation, and construction‑administration services over a three‑year performance period. The contract will be funded partially with Federal Transit Administration assistance and has an anticipated design‑phase ceiling of roughly $1.4 million.
• Full‑service A/E design for a 10,000 sf heated bus transfer facility, including site‑specific studies, seismic considerations, and public‑involvement processes.
• Required deliverables: design studies, preliminary/final design packages, construction documents, and construction‑administration support.
• Mandatory submission of a signed proposal and an FTA certification form; evaluation weighted across scope, methodology, team, control, experience, and public‑involvement.
• Proposal deadline is May 14, 2026 12 PM local; questions were due April 15, 2026 12 PM.