The City of Thornton is seeking a qualified contractor to install approximately 70.6 miles of 72‑strand fiber‑optic cable and 1,200 ft of 24‑strand branch cable, including horizontal directional drilling (HDD) for new conduits, hand‑hole construction, splicing, termination, and related civil works. The project supports the municipal water‑system communications network and requires strict adherence to Colorado state and local regulations, including storm‑water permits, utility coordination, and a robust non‑disclosure agreement for handling critical‑infrastructure data. Bidders must attend a mandatory pre‑bid conference, submit a 5 % bid bond, and be prepared to provide performance and payment bonds after award. Local‑vendor discounts are available for Thornton‑based businesses.
• Install 72‑strand trunk fiber‑optic cable (≈ 70.6 mi) and 24‑strand branch cable (≈ 1,200 ft).
• Perform 1,400 ft of horizontal directional drilling for new 2‑in. conduits, with hand‑holes, surface restoration, and temporary cattle fencing.
• Provide all required documentation (as‑built drawings, O&M manuals, warranties) and comply with NDA, security, and storm‑water management requirements.
• Mandatory pre‑bid conference on Sept 22, 2026; bid deadline Oct 8, 2026, 2 PM.
• Bonds, insurance, licensing, and local‑vendor discount criteria must be satisfied before award.