Description
The Well No. 7 Rehabilitation-Phase 3 Project involves adding a sand separator to the pump at Well No. 7, including the removal of the motor, well column piping, and pump assembly, and reinstalling the pump and motor unit. The project is located at the Well No. 7 site in Dubuque, Iowa. The base bid estimated total cost is $80,000.00.
Key aspects of the project include:
• Adding a sand separator to the pump at Well No. 7
• Removing the motor, well column piping, and pump assembly
• Reinstalling the pump and motor unit
• Including all piping and appurtenances
• Located at the Well No. 7 site in Dubuque, Iowa