Description
The Truckee Meadows Water Authority (TMWA) is accepting sealed bids for the installation of two 10-inch Vacuum Breaking / Air Release valves on the Highland Main, and a 24-inch butterfly valve installation on the Northgate main, within the property at the Chalk Bluff WTP. The project is deemed a Horizontal Construction Project. The Engineer's estimate for the project is between $337,500 and $412,500.
• The project involves the installation of valves on the Highland Main and Northgate main.
• The project is a Horizontal Construction Project.
• Bids must be submitted electronically via NGEM.
• The Bid Tab and Recommendation for Award will be posted online as soon as is practicable and available to the public for viewing.