Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Mexico
  4. ›Closed bids
  5. ›Engineering Services for New Carbon Coal Substation – Design, Proje…

City of Gallup·New Mexico

Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

Closes 5/26/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Gallup is soliciting proposals from qualified firms to provide comprehensive engineering, design, coordination, and construction support services for the development of a new 115kV to 13.2kV substation in the Carbon Coal Road area. This project aims to support long-term system reliability, load growth, and regional economic development. The City seeks a highly qualified firm capable of delivering a fully constructible, coordinated, and schedule-driven project. The scope of services includes engineering design, project management, and full project delivery. The evaluation criteria include company experience, technical expertise, roles and responsibilities, professional credentials, project management capability, past performance, availability and commitment, and cost. • The project involves the design and construction of a new substation, including high-voltage equipment specification and layout, protection and control systems, SCADA integration, relay coordination and studies, grounding, lightning protection, and insulation coordination. • The City requires the selected firm to have experience in distribution, substations, transmission, and generation, as well as familiarity with power supply/system planning, low, medium, and high voltage power system design, financial/rate analysis and development, system protection, and power requirement analysis. • The firm must also have a minimum of 10 years of continuous experience in one or more of the relevant fields and working knowledge of State and Federal regulations related to integrated resource planning, power generation, and power transmission systems.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jose Romero(Purchasing Director)

[email protected]

(505) 726-6060

Key dates

Opened
4/17/2026
Questions due
5/11/2026
Closes
5/26/2026

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP No. 2025/2026/06

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity is estimated to be in the range of $500,000 to $2,000,000, based on the scope of the project and the typical costs associated with substation design and construction. The actual budget will depend on the proposal submitted by the selected firm and the final contract agreement. Factors that may influence the budget include the complexity of the project, the experience and qualifications of the selected firm, and the level of competition among bidders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Gallup·New Mexico

Top match · 81%

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/5/2026Opened 7/24/2026

Oregon Northern Wasco County PUD·Oregon

72% match

Columbia Heights Substation

Closes 10/13/2026Opened 9/8/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

71% match

40th Street Substation Build – GC/EC/MC

Closes 10/15/2026Opened 9/17/2026

North Carolina City of Rocky Mount·North Carolina

71% match

Substation 10 Transformer Upgrade Re-Bid

Closes 10/14/2026Opened 10/5/2026

City of Pasadena·California

71% match

Mobile Substation Project

Closes 11/4/2026Opened 9/2/2026

Northern Wasco County Peoples Utility District·Oregon

71% match

ITB – Columbia Heights Substation

Closes 10/13/2026Opened 9/8/2026

City of Piqua·Ohio

70% match

24-17.9C Steel Structures Project

Closes 10/21/2026Opened 9/8/2026

City of Piqua·Ohio

70% match

City of Piqua 69 kV “The Site” Substation – Control Building and Relay Panels (Project 24‑17.9A)

Closes 10/21/2026Opened 9/8/2026

Lee County Electrical Cooperative·Florida

70% match

North Lehigh Substation Underground Construction

Closes 10/23/2026Opened 9/4/2026

City of Cape Coral·Florida

70% match

Professional Engineering & Design Services for the North 6 and Future Utilities Extension Project (UEP) Areas

Closes 10/29/2026Opened 9/28/2026

Wyoming State Construction Department·Wyoming

70% match

Design/Engineering Services for Western Wyoming Community College Powerline Technology Facility - Rock Springs, WY

Closes 11/3/2026Opened 9/24/2026

City of Pasadena·California

70% match

Power Delivery General Engineering Services

Closes 11/5/2026Opened 9/24/2026

City of Piqua·Ohio

70% match

24-17.10 Electrical Construction Piqua 69kV The Site Substation

Closes 10/22/2026Opened 9/8/2026

U.S. Department Of Energy·New York

69% match

Building 510 Substation Upgrade - Phase I

Closes 10/23/2026Opened 10/12/2026

City of Springfield·Illinois

69% match

Alpha Substation Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

City of Clearwater·Florida

69% match

Design-Build Services for Standby Generator at Clearwater Executive Airport CNG Station

Closes 10/22/2026Opened 9/18/2026

North Carolina Appalachian State University·North Carolina

69% match

Appalachian State University

Closes 10/29/2026Opened 9/23/2026

Nevada Colorado River Commission·Nevada

69% match

High Voltage System Engineering Services

Closes 10/26/2026Opened 9/3/2026

City of Springfield·Illinois

69% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

City of Piqua·Ohio

69% match

Steel Structures – Piqua 69 kV The Site Substation & Washington Road 69 kV Transmission Line

Closes 10/21/2026Opened 9/8/2026

Fort Pierce Utilities Authority·Florida

69% match

Electric Continuing Design-Build Services

Closes 10/16/2026Opened 9/4/2026

City of Roseville·California

69% match

Design-Assist Construction of Pleasant Grove Wastewater Treatment Plant Electrical Power System Capacity Expansion Project

Closes 10/28/2026Opened 9/2/2026

Port of Stockton·California

69% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

City of Cape Coral, FL·Florida

69% match

Professional Engineering & Design Services for the North 6 and Future Utilities Extension Project (UEP) Areas

Closes 10/29/2026Opened 9/28/2026

MTA - NYC Transit (NYCT)·New York

69% match

Preliminary Engineering and Planning Services for Climate Resilience and Infrastructure Improvements on the Metro-North Railroad.

Closes 3/5/2027Opened 1/26/2026