Description
The City of Wheaton is soliciting qualified engineering firms to produce a comprehensive Emergency Well and Storage Expansion Study, addressing a critical vulnerability identified in the 2026 Risk‑Based Water System Analysis. This study will guide the city in developing countermeasures to reduce reliance on the DuPage Water Commission and improve system resiliency.
• Conduct a detailed assessment of emergency well options and storage capacity needs.
• Develop engineering designs and cost estimates for recommended solutions.
• Align recommendations with the 2026 Risk‑Based Water System Analysis findings.
• Provide implementation phasing, permitting considerations, and risk mitigation strategies.
• Deliver a final report suitable for city decision‑makers and potential funding sources.
Attached files
The solicitation documents live at the source — open the bid source above to download them.