Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Mexico
  4. ›Closed bids
  5. ›WWTP Submersible Pump Replacement

New Mexico City of Clovis·New Mexico

WWTP Submersible Pump Replacement

Closes 1/9/2026$25kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Clovis is seeking to replace a failed submersible pump at the Wastewater Treatment Plant (WWTP) due to an immediate threat to public health, safety, and the environment. The replacement pump is a Sulzer-ABS XFP101G-CB1.1-PE300/2, 4-inch Submersible Pump with a 40 HP motor. The contract was awarded to Falcon Environmental, the sole authorized supplier for Sulzer pumps in the region, due to the urgency of the situation. The scope of work includes the replacement of the failed pump with a new one, with the existing base and control to be used with the new pump. Key points: • The replacement pump is a Sulzer-ABS XFP101G-CB1.1-PE300/2, 4-inch Submersible Pump with a 40 HP motor. • The contract was awarded to Falcon Environmental due to their sole authorized supplier status for Sulzer pumps in the region. • The replacement is necessary due to an immediate threat to public health, safety, and the environment. • The existing base and control will be used with the new pump.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Amanda Cook(Purchasing Agent)

(575) 769-7827

Key dates

Opened
12/11/2025
Closes
1/9/2026
Duration
2 days

Last updated

Details

Type
Sole Source
Industry
Utilities and Waste Management
NAICS
221320
Solicitation №
60-M0020-25-EM143

Budget estimate

$24,760

The budget for this opportunity can be estimated based on the contract amount, which is $24,760.00. This amount is already provided in the document, so no additional estimation is required. The factors that may influence the likely payment range include the cost of the replacement pump, labor costs, and any additional expenses related to the replacement process.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Santa Maria Public Airport District·California

Top match · 66%

Sump Pump Replacement and Installation

Closes 10/16/2026Opened 9/30/2026

City of Chesapeake·Virginia

64% match

IFB 27-014-2230 Pump Station #43 Replacement

Closes 10/27/2026Opened 9/25/2026

U.S. Department Of Defense·Pennsylvania

64% match

PUMP,CENTRIFUGAL

Closes 10/20/2026Opened 9/30/2026

Town of St. George·South Carolina

64% match

I95 Well

Closes 10/21/2026Opened 10/6/2026

U.S. Department Of Defense·Oregon

64% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

U.S. Department Of Defense·United States of America

63% match

43--HOUSING,LIQUID PUMP

Closes 11/17/2026Opened 10/7/2026

Madison Metropolitan Sewerage District·Wisconsin

63% match

Pump Repair and Maintenance

Closes 10/16/2026Opened 9/30/2026

U.S. Department Of Defense·United States of America

63% match

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/9/2026

South Fork Water·Oregon

63% match

2026 On-Call Pump Service Contract

Closes 10/15/2026Opened 9/25/2026

City of Lewiston·Maine

63% match

2026-039 2026 Pump Station Replacements - Foss 2 and Sabattus

Closes 10/27/2026Opened 8/12/2026

City of Plymouth, Minnesota·Minnesota

63% match

Zachary WTP High Service Pump 3, 4, and 5 Maintenance Project

Closes 10/29/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

63% match

PUMP,CENTRIFUGAL

Closes 10/16/2026Opened 10/9/2026

U.S. Department Of Defense·Pennsylvania

63% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/15/2026

City of Hollywood·Florida

63% match

Flygt Pump & Parts

Closes 10/15/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

62% match

PUMP,ROTARY

Closes 10/14/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

62% match

PUMP,CENTRIFUGAL

Closes 10/20/2026Opened 9/30/2026

U.S. Department Of Defense·Pennsylvania

62% match

HOUSING,LIQUID PUMP

Closes 10/16/2026Opened 9/30/2026

Shasta County·California

62% match

Wastewater and Water Pump Repair Services

Closes 10/14/2026Opened 9/14/2026

U.S. Department Of Defense·Pennsylvania

62% match

43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF

Closes 10/21/2026Opened 6/4/2026

North Attleborough Housing Authority·Massachusetts

62% match

Fire Pump Replacement

Closes 10/29/2026Opened 9/30/2026

New York City Department of Environmental Protection·New York

62% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 10/21/2026Opened 8/31/2026

Town of Narragansett·Rhode Island

62% match

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

City of Rapid City·South Dakota

62% match

Well 5 Motor Replacement

Closes 10/27/2026Opened 10/10/2026

Metropolitan Council·Minnesota

62% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

62% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/2/2026Opened 10/2/2026