Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›TM Fiber Optic Network
More bids in District of Columbia →

U.S. Department Of Commerce·District of Columbia

TM Fiber Optic Network

Closes 7/7/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Department of Commerce, National Telecommunications and Information Administration, is seeking a contractor to rebuild the fiber optic network at the Table Mountain Field Site in Longmont, Colorado. The project involves replacing the existing fiber optic backbone with a new armored, jacketed single-mode fiber optic cable, and installing new networking equipment. The contractor will be responsible for designing and engineering the network, procuring equipment, and constructing the new fiber optic network. The project consists of five main phases: network design and engineering, identify/procure equipment, construction, networking equipment install, and project closeout. The contractor will be required to work closely with the government representative and provide regular updates and deliverables throughout the project. • The project requires the installation of approximately 18 km of armored, jacketed single-mode fiber optic cable. • The contractor will be responsible for terminating the fiber optic cable at each building and field site. • The project includes the installation of new networking equipment, including outside plant boxes and cabinets, pedestals, and fiber distribution bays. • The contractor will be required to perform industry-standard, end-to-end testing of each newly installed fiber pair and CAT 6A cable. • The project has a total duration of 365 days, and the contractor will be required to provide a project plan and schedule.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jacqueline Brown

[email protected]

(202) 316-2730

Key dates

Opened
6/26/2026
Closes
7/7/2026
Duration
365 days

Last updated

Details

Type
Request for Proposal
Industry
Telecommunications
NAICS
237130
Solicitation №
NTIA000026TMFiber

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity can be estimated based on the scope of work and the materials required. The project involves the installation of approximately 18 km of armored, jacketed single-mode fiber optic cable, as well as the installation of new networking equipment. The cost of the materials and labor required for this project can be significant. Based on industry standards, the cost of installing fiber optic cable can range from $10 to $50 per foot, depending on the type of cable and the complexity of the installation. For this project, the cost of the fiber optic cable alone could be in the range of $180,000 to $900,000. Additionally, the cost of the networking equipment, including outside plant boxes and cabinets, pedestals, and fiber distribution bays, can range from $50,000 to $200,000. The total budget for this opportunity could be in the range of $500,000 to $2,000,000, depending on the complexity of the project and the materials required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Oakland·California

Top match · 60%

Next

Closes 11/12/2026Opened 8/30/2024

Utility Board of the City of Key West·Florida

60% match

Specifications for Fiber Optic Services and Materials

Closes 10/23/2026Opened 9/14/2026

Columbia Public Schools·Missouri

60% match

RFP NO C 28006 wan fiber services to various district locations

Closes 11/16/2026Opened 10/12/2026

City of Superior·Wisconsin

60% match

Fiber Phase 3 Construction Phase

Closes 10/20/2026Opened 9/11/2026

Massachusetts Bay Transportation Authority·Massachusetts

60% match

IFB # 133-26: Furnish Fiber Optic Cable

Closes 11/4/2026Opened 10/8/2026

U.S. Department Of Defense·California

60% match

Sources Sought - Modular Fiber Optic Test Platform

Closes 12/12/2026Opened 1/8/2026

Columbia Public Schools·Missouri

60% match

RFP NO C 28005 wan fiber services city

Closes 11/16/2026Opened 10/12/2026

Robla School District·California

59% match

OPEN:

Closes 11/23/2026Opened 10/9/2026

Massachusetts Executive Office of Technology Services and Security·Massachusetts

59% match

Notice of Purchase Mass Technology Collaborative

Closes 6/30/2038Opened 7/21/2011

Oregon Northern Wasco County PUD·Oregon

59% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

City of Tuscaloosa IT Department·Alabama

59% match

Bid - Fiber Optic Network Expansion

Closes 10/14/2026Opened 9/11/2026

Navajo Nation·Arizona

59% match

Proposal for Lit Fiber With Special Construction -NM Location Only ADDENDUM #2

Rolling / TBD closeOpened 9/11/2026

Navajo Nation·Arizona

59% match

Proposal for Lit Fiber With Special Construction -AZ Location Only ADDENDUM #2

Rolling / TBD closeOpened 9/11/2026

City of Thornton·Colorado

59% match

Thornton Water Project - Fiber Optic Installation

Closes 10/13/2026Opened 9/10/2026

Northern Wasco County Peoples Utility District·Oregon

58% match

Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

Maryland Transit Administration·Maryland

58% match

Light Rail CBD Fiber Replacement

Closes 10/13/2026Opened 7/20/2026

University of Missouri System·Missouri

58% match

Data Transport Services

Closes 10/20/2026Opened 9/15/2026

Robla School District·California

58% match

OPEN:

Closes 11/23/2026Opened 10/9/2026

U.S. Department Of Defense·Virginia

58% match

SPE4A727R0023 - 5180 – FIBER OPTIC SYSTEM / WSIC J

Closes 11/19/2026Opened 10/5/2026

U.S. Department Of Energy·Idaho

58% match

Fiber Dial Room Refurbishment

Closes 12/11/2026Opened 2/25/2026

Robla School District·California

58% match

RFP 23-103 Leased Dark or Lit Fiber Service Questions and Answers

Rolling / TBD closeOpened 4/20/2026

Clemson University·South Carolina

58% match

Off Campus Fiber Builds

Closes 6/10/2029Opened 6/13/2024

Navajo Nation·Arizona

58% match

Proposal for Lit Fiber With Special Construction -UT Location Only ADDENDUM #2

Rolling / TBD closeOpened 9/11/2026

Alaska Department of Natural Resources, Division of Mining, Land and Water (DMLW)·Alaska

58% match

ADL 234755 Calista Lower Kuskokwim Broadband Fiber Optic Line

Rolling / TBD closeOpened 8/20/2026

U.S. Department Of Defense·Pennsylvania

57% match

CABLE,FIBER OPTIC

Closes 10/26/2026Opened 9/24/2026