Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Building 510 Substation Upgrade - Phase I
More bids in New York →

U.S. Department Of Energy·New York

Building 510 Substation Upgrade - Phase I

Closes 10/23/2026$3M – $7MRequest for Expression of Interest
Get bids like this by emailBid source

Description

The Brookhaven Science Associates (BSA) is issuing a Notice of Interest for contractors to submit statements of interest and capability statements for the complete removal and upgrade of Building 510’s electrical substation, including the installation of new medium‑voltage transformers, switchgear, and duct‑bank infrastructure. The contractor will provide labor, supervision, materials (excluding supplied switchgear and transformers), equipment, and services for demolition, construction, and phased commissioning while minimizing service disruptions. Government‑furnished equipment (switchgear and transformers) will be provided, but the contractor must not procure these items. This effort supports modernization of a mission‑critical research facility. • Scope: Remove existing substation equipment, install new exterior substation with two MV transformers, pad‑mounted MV switchgear, and new MV feeders in concrete‑encased duct bank. • Location: North‑loading dock parking lot of Building 510, Brookhaven National Laboratory, New York (ZIP 11973). • Requirements: Electrical construction expertise, ability to work with GFE, phased execution to limit downtime, provision of all labor, supervision, materials (except switchgear/transformers), and equipment.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Megan Howard

[email protected]

(631) 344-2712

Key dates

Opened
10/12/2026
Closes
10/23/2026

Last updated

Details

Type
Request for Expression of Interest
Industry
Construction
NAICS
238210
Solicitation №
MH484019

Budget estimate

$3,000,000 – $7,000,000

No contract value is disclosed, but a full substation upgrade involving demolition, new MV transformers, switchgear, concrete duct‑bank construction, and phased commissioning at a DOE research lab typically ranges from a few million to several million dollars. Considering material costs, labor, equipment, and specialized electrical work, a reasonable estimate is between $3 million and $7 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

Top match · 81%

Building 15 Electrical Upgrade – New Jersey State Police Headquarters

Closes 10/15/2026Opened 7/28/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

79% match

40th Street Substation Build – GC/EC/MC

Closes 10/15/2026Opened 9/17/2026

NYS MTA - Metro-North Railroad·New York

79% match

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

NYS OGS Design & Construction - Construction Contractors·New York

79% match

Provide Switchgear & Control System Modification – Five Points Correctional Facility (46151‑E Electrical)

Closes 10/21/2026Opened 9/23/2026

U.S. Department Of Veterans Affairs·New York

79% match

Brooklyn Upgrade Life Safety/Critical Branch Electrical Construction - 630A4-16-430

Closes 10/30/2026Opened 9/30/2026

Iowa State University·Iowa

79% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

New York City Department of Education·New York

79% match

B5721: Requirement Contract for Electrical Installations and Repair

Rolling / TBD closeOpened 9/17/2026

U.S. Department Of Defense·District of Columbia

79% match

Air Compressor Relocation

Closes 10/16/2026Opened 9/30/2026

North Carolina City of Rocky Mount·North Carolina

79% match

Substation 10 Transformer Upgrade Re-Bid

Closes 10/14/2026Opened 10/5/2026

City of Albany·Georgia

79% match

Viper Automatic Switch Installation Phase 2 - Substation #2,3,5,10 & 14

Closes 10/14/2026Opened 9/14/2026

Texas San Jacinto College District·Texas

79% match

CSP #27-01 Electrical Upgrades, Buildings C30, C31, C32

Closes 10/14/2026Opened 9/16/2026

Fort Pierce Utilities Authority·Florida

78% match

Totten Substation TT3 Site Construction and Installation

Closes 10/22/2026Opened 9/18/2026

City of Wilton Manors·Florida

78% match

Lift Station No. 1 Replacement

Closes 11/2/2026Opened 9/30/2026

SUNY Upstate Medical University – Community Hospital·New York

78% match

SUNY Upstate - Community Hospital Modular SPD Phase 1

Closes 10/13/2026Opened 9/14/2026

NYS OGS Design & Construction - Construction Contractors·New York

78% match

Provide Energy Efficient Upgrades

Closes 10/21/2026Opened 9/8/2026

Oregon Northern Wasco County PUD·Oregon

78% match

Columbia Heights Substation

Closes 10/13/2026Opened 9/8/2026

NYS OGS Design & Construction - Construction Contractors·New York

78% match

47161 HVAC – Provide Energy Efficient Upgrades

Closes 10/21/2026Opened 9/8/2026

New York City Department of Education·New York

78% match

Bid Extension: Requirement Contract for Electrical Installations and Repair

Closes 9/9/2039Opened 3/26/2026

City of Piqua·Ohio

78% match

City of Piqua 69 kV “The Site” Substation – Control Building and Relay Panels (Project 24‑17.9A)

Closes 10/21/2026Opened 9/8/2026

U.S. Department Of Energy·Illinois

78% match

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Closes 11/17/2026Opened 10/6/2026

California Department of General Services·California

78% match

CONTRACT NUMBER: 26-334792; AUGMENTATION OF ELECTRICAL SERVICE CAPACITY, DEPARTMENT OF STATE HOSPITALS, NAPA STATE HOSPITAL, NAPA, NAPA COUNTY, CALIFORNIA, PROJECT NUMBER: 14109

Closes 10/27/2026Opened 9/18/2026

NYC Brooklyn Navy Yard Development Corp.·New York

78% match

Brooklyn Navy Yard Building 203 Boiler Plant and Building 365 Substation & Boiler Projects

Closes 12/4/2026Opened 10/5/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

78% match

Construction Management for the 30th Street WestCatenary Replacement Project – Phase 1A

Closes 11/5/2026Opened 9/21/2026

Georgia City of Albany·Georgia

78% match

27-023 Viper Switch Installation Phase 2

Closes 10/14/2026Opened 9/14/2026

U.S. Department Of Energy·New York

78% match

Mechanical Services Basic Ordering Agreement (BOA)

Closes 10/30/2026Opened 2/25/2026