Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›N--Pompey's Pillar Iron Filter Tanks
More bids in Montana →

U.S. Department Of The Interior·Montana

N--Pompey's Pillar Iron Filter Tanks

Closes 5/7/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Bureau of Land Management (BLM) is soliciting quotes for the removal and replacement of three existing iron filtration units, replacement of exhausted filter media, rehabilitation of associated treatment components, and reactivation of the system to restore proper operation of the drinking water facility at Pompey's Pillar in Montana. The project requires the replacement of two hydropneumatic tanks and the removal and disposal of liquid waste generated under the contract. The contractor must assume that offsite disposal at an appropriately licensed facility is required and include all associated costs in their proposal. * The project location is within Yellowstone County, Montana. * The work location is 3039 Highway 312, Pompey's Pillar, MT 59064. * The average water demand of the system is 1300 gallons per day with a maximum demand of 6000 gallons per day. * The system supplies the Pompey's Pillar Interpretive Center. * The existing pump is a Goulds 33GS20 with an Aquavara AVII Variable speed pump controller. * The well has a total depth of 33 feet with a static water level of 4.5 feet.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jorge Alvarez(Contracting Officer)

[email protected] or [email protected]

(854) 500-1840

Key dates

Opened
5/4/2026
Questions due
5/7/2026
Closes
5/7/2026
Duration
50 days

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
238220
Solicitation №
140L3626Q0023

Budget estimate

$200,000 – $500,000

The budget for this project is estimated to be between $200,000 and $500,000. This estimate is based on the scope of work, which includes the removal and replacement of three existing iron filtration units, replacement of exhausted filter media, rehabilitation of associated treatment components, and reactivation of the system. The cost of materials, labor, and disposal of liquid waste are expected to be significant. Additionally, the contractor must include all associated costs for offsite disposal of liquid waste, which may add to the overall cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.