Description
The North Carolina Department of Natural and Cultural Resources is seeking an engineering firm to provide design, bidding, construction administration, and closeout services for the installation of Level 3 Electric Vehicle Charging Stations at multiple sites. The project includes the installation of DC Fast Chargers with all required infrastructure at six locations. The selected firm will be responsible for providing a Letter of Interest and SF-254, and must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. The selection committee will consider factors such as specialized expertise, past performance, and proposed design approach.
• The project includes six locations: Historic Edenton, Historic Bath, Jones Lake State Park, Hanging Rock State Park, Stone Mountain State Park
• The total project budget is $665,000, with $100,000 available for planning and design
• The project requires the installation of DC Fast Chargers with all required infrastructure
• The selected firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina
• The selection committee will consider factors such as specialized expertise, past performance, and proposed design approach
Attached files
The solicitation documents live at the source — open the bid source above to download them.