Description
The U.S. Fish and Wildlife Service is seeking a contractor to replace an existing burned 400-amp solar electrical panel, breakers, and associated electrical components serving a deep well and its solar power infrastructure at the Merced National Wildlife Refuge. The project includes providing and installing a new upgraded electrical distribution panel and associated equipment to restore safe, reliable, and code-compliant operation of the solar-powered well system. The construction magnitude is estimated to be between $15,000 to $25,000.
• The contractor must have experience with solar installation and knowledge of solar brands.
• The contractor must comply with all state and local laws.
• The contractor must provide a firm-fixed-price contract.
• The contractor must be registered at the System for Award Management (SAM) website as an active vendor.
Attached files
The solicitation documents live at the source — open the bid source above to download them.