This solicitation invites qualified electrical contractors to construct a new 69 kV substation for the City of Piqua, Ohio (Project 24‑17.10). The scope includes installing high‑voltage structures, foundations, grounding systems, conduit, control cables, and major equipment such as transformers, circuit breakers, and surge arrestors, followed by testing, start‑up, and site cleanup. The engineer’s estimate is $1.31 million, and Ohio prevailing‑wage rules apply. Bidders must submit a bid bond (5 % of the bid amount) and meet a range of compliance affidavits (non‑collusion, drug‑free, ADA, etc.).
• Install and commission all electrical components for a 69 kV substation (structures, foundations, grounding, conduit, control cabling).
• Provide testing, start‑up, and site preparation/cleanup services in accordance with Ohio prevailing‑wage requirements.
• Submit a complete bid package (technical, financial, bonding, and required affidavits) by 11:00 AM on 19 Oct 2026.
• Pre‑bid meeting on 22 Sep 2026 (attendance encouraged) and a written‑question deadline of 13 Oct 2026.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
R.J. Monnier(Power Systems Director)