Description
The Muscatine Power and Water company is seeking bids for the NOFA 9 Fiber to the Home Route Extensions Addendum 2 project. The project involves identifying and mapping out conduit routes and vault locations for the construction process. The project is divided into two phases: Phase 1 for permitting and Phase 2 for the placement of conduit and vaults. The bidder is required to submit a sealed bid, which includes a bid form, equipment and labor rate schedule, previous experience, references, and other attachments. The bid opening will be broadcast online via Microsoft Teams.
• The project requires the bidder to have experience in similar projects, with a minimum of three references.
• The bidder must submit a bid that includes all the required attachments and information.
• The project has a deadline for submission, and any bids received after the deadline will be disqualified.
• The bidder must comply with all the requirements and regulations specified in the bid documents.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Lani Stanton(Project Specialist)