Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Closed bids
  5. ›Boiler Feedwater Pump 3 Replacement

Olmsted County·Minnesota

Boiler Feedwater Pump 3 Replacement

Closes 5/7/2026$50k – $200k
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Olmsted County is seeking a contractor to replace the existing boiler feedwater pump #3 at the Olmsted Waste to Energy Facility in Rochester, Minnesota. The project includes the replacement of the pump only, and the contractor will be responsible for ensuring that the new pump meets the specifications outlined in the bidding documents. The project requires the contractor to acknowledge the specifications, proposed work schedule, and terms and conditions of the contract. The contractor must also comply with the Responsible Contractor Act and provide verification of compliance with the minimum criteria. • The project is a one-time replacement of a boiler feedwater pump. • The contractor must meet the specifications outlined in the bidding documents. • The contractor must comply with the Responsible Contractor Act. • The contractor must provide verification of compliance with the minimum criteria. • The project requires the contractor to acknowledge the proposed work schedule and terms and conditions of the contract. • The contractor must review all available information and acknowledge site conditions.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Wendy Fenton(Contracts Manager)

[email protected]

(507) 328-6549

Key dates

Opened
4/2/2026
Questions due
5/1/2026
Pre-bid meeting
4/28/2026
Closes
5/7/2026

Last updated

Details

Industry
Energy and Utilities
NAICS
333911
Solicitation №
RFQ2026-203 Addendum 1

Budget estimate

$50,000 – $200,000

Based on the project description, the estimated budget for this project could range from $50,000 to $200,000. This estimate is based on the assumption that the replacement of a boiler feedwater pump is a relatively complex project that requires specialized equipment and labor. The actual budget may vary depending on the specifics of the project, such as the size and type of pump, the complexity of the installation, and the contractor's level of expertise. Factors that may influence the likely payment range include the cost of materials, labor costs, and any additional services or equipment required for the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.