The Snohomish County Public Utility District is soliciting bids to replace approximately 2,250 linear feet of eight‑inch ductile‑iron water main on 119th Pl NE, 177th Ave NE, and 178th Dr NE near Granite Falls, WA. The scope includes installation of the new main, 41 water services, five fire hydrants, two blow‑off assemblies, one air‑vacuum release assembly, three PRV vaults, associated fittings, and extensive site work such as trench excavation, de‑watering, erosion control, asphalt trench patching, restoration overlays, private driveway removal/restoration, gravel driveway work, and landscape/surface restoration. The contractor must provide all labor, equipment, tools, materials, and incidentals, obtain required permits, submit SWPPP/ESCP, manage traffic control, and coordinate with district engineers. The engineer’s estimate for the project is $1.7 million. Bids are submitted electronically via the Public Purchase website; the bid opening will be a teleconference. • Install 2,250 ft of 8″ ductile‑iron water main • Provide 41 water services, 5 fire hydrants, 2 blow‑off assemblies, 1 air‑vacuum release, 3 PRV vaults • Perform trench excavation, de‑watering, erosion control, asphalt patching & overlay • Restore private driveways, gravel drives, and landscaping • Submit electronic bid by Sep 30 2026, 5 PM EDT