The Town of Bennington is soliciting bids for a General Construction contract to extend and upgrade its water distribution system along five streets in the town. The work includes full trenching, removal of existing asphalt and sub‑base, installation of new water mains, directional drilling, thrust blocks, fire hydrants, curb stops, service lines, interior residential plumbing connections, well abandonment, and reconstruction of the roadway base and pavement. The project is funded partially by the Vermont Drinking and/or Clean Water State Revolving Fund and is subject to DBE, Davis‑Bacon, Buy‑America, and other federal requirements. Bidders must provide bid security, performance and payment bonds equal to 100 % of the contract price, and comply with all specified provisions.
• Scope: trenching, asphalt removal, water‑main installation, directional drilling, thrust blocks, hydrants, curb stops, service lines, residential plumbing connections, well abandonment, road base and pavement reconstruction.
• Location: Meadowbrook Dr, Southshire Dr, North Terrace Dr, South Terrace Dr, Hickory Hill Rd – Town of Bennington, VT.
• Funding: Vermont Drinking and/or Clean Water State Revolving Fund (DWSRF) with DBE, Davis‑Bacon, and Buy‑America mandates.
• Bonds: Performance and payment bonds each equal to 100 % of contract price.
• Pre‑bid conference: 10/22/2026 11:00 AM, Town of Bennington DPW, 78 Bowen Rd (optional).
• Bid submission deadline: 11/19/2026 2:00 PM at Town of Bennington DPW.
• Contact: Nicholas Ratzer, Project Engineer, MSK Engineers.