Muscatine Power and Water is seeking a prime general contractor to execute the balance‑of‑plant work for Unit 10 of its combined heat and power (CHP) plant. The scope includes erection of owner‑furnished equipment, drilled pier foundations, concrete slab and pad construction, structural steel fabrication and installation, pipe‑rack supports, and design of structural steel connections. Subcontractors may be engaged for specialized trades, but the contract will be awarded to a single prime contractor responsible for overall coordination, safety compliance, and schedule adherence. The project is slated to start in January 2027 and be completed by December 2027. Bids must be sealed, submitted electronically via Ion Wave, and include extensive qualifications, references, safety plans, and compliance documentation (prevailing wage, apprenticeship, domestic content).
• Location: Muscatine, Iowa (MPW Generation Station Unit 9/10)
• Contract Type: Invitation to Bid – sealed bid, prime contractor award
• Estimated Value: Not disclosed (industry‑typical $10‑$20 M for similar balance‑of‑plant work)
• Key Work Elements: equipment erection, deep foundation/drilled piers, concrete foundations & slabs, structural steel & pipe‑rack, steel‑connection design, safety & quality plans
• Mandatory Submissions: qualifications, references (last 3‑5 years), safety & quality plans, subcontractor lists, inflation‑reduction‑act narratives, prevailing‑wage compliance
• Pre‑bid Meeting: 9/15/2026 (on‑site & virtual) – optional
• Bid Deadline: 10/27/2026 3:00 PM CT