Metropolitan Water District of Southern California is seeking a qualified Construction Manager/General Contractor (CM/GC) to deliver fullâscope preâconstruction and construction services for a new ~10,000 sq ft Direct Potable Reuse (DPR) demonstration plant and associated site improvements. The effort is split into a Phase 1 preâconstruction period (design, valueâengineering, permitting, procurement planning) and a Phase 2 construction period (site work, equipment installation, commissioning, and handâover). The contractor must hold a California Class âAâ contractor license, provide required performance and payment bonds ($60 M), meet extensive insurance and safety requirements, and comply with a Project Labor Agreement and buyâAmerica preferences.
⢠Provide endâtoâend CM/GC services: project management, design development (30 %â60 %â90 % design), valueâengineering, schedule & cost estimating, procurement, and construction execution.
⢠Deliver a fully integrated DPR facilityâincluding new motor control center, SCADA upgrades, modular field offices, and upgrades to the existing IPR plantâwithin a 430âday delivery window after noticeâtoâproceed.
⢠Meet strict technical specifications for multiple process systems (membrane filtration, RO, ozone, GAC, UV/AOP, lime stabilization, COâ feed) and adhere to seismic, wind, and NSF waterâcontact standards.
⢠Submit a 5âhardâcopy SOQ within the deadline, attend the mandatory preâbid meeting/site tour, and provide detailed documentation (QAP, submittals, schedules, warranties, training) throughout the project lifecycle.