This contract awards the design‑build of the Envision Triangle streetscape improvement in downtown Sacramento, covering closure of a city block, demolition of existing pavement, and construction of new sidewalks, a Class IV bikeway, curb ramps, traffic signals, lighting, landscaping, and irrigation upgrades. The work must be completed within a tight 45‑day schedule and includes extensive utility coordination, tree protection, and compliance with local labor, LBE, and potential CWTA requirements.
• Close 2nd Avenue block, remove existing roadway, install new pavement, sidewalks, and Class IV bikeway.
• Install curb ramps, new traffic signals, street lighting, signage, and irrigation system with tree‑bubbler and sprinkler modifications.
• Perform landscaping, planting, and hard‑scape installation (bollards, pavers, architectural elements) while meeting stringent safety, environmental, and labor‑compliance standards.