Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Construction
  5. ›F&W, Residential House, Resident Fish Hatchery - Sturgeon

Confederated Tribes of the Colville Reservation·Washington

F&W, Residential House, Resident Fish Hatchery - Sturgeon

Closes 10/30/2026$900k – $1.5MRequest for Proposal
Get bids like this by emailBid source

Description

The Confederated Tribes of the Colville Reservation are seeking a single prime design‑build contractor to construct a new 1,598‑square‑foot, three‑bedroom, two‑bathroom single‑family residence with an attached two‑car garage on a vacant parcel adjacent to the Resident Fish Hatchery in Bridgeport, WA. The contractor must provide full design, permitting, site development (grading, storm‑water, driveway, utility trenching), underground utilities (200‑A electric service, domestic well, septic system), and construction of the house, including all interior finishes, mechanical, electrical, and plumbing systems, as well as testing, commissioning, and close‑out documentation. The contract is an indeterminate‑duration award with a minimum three‑year term and may be renewed year‑to‑year subject to tribal appropriations. The solicitation emphasizes Indian Preference/TERO scoring and requires the contractor to be capable of handling all phases of a design‑build residential project, including coordination with tribal permitting authorities. • Design‑build scope covering architectural, structural, MEP, and civil engineering deliverables. • Site development includes grading, drainage, utility installation, well drilling, and septic system design/installation. • Required certifications: debarment, insurance, performance bond (if > $100 k), and compliance with tribal Indian Preference scoring. • Proposal must be ≤30 pages, single‑spaced, with hard‑copy and electronic submissions by 26 Oct 2026. • Contract term minimum 3 years, with possible year‑to‑year extensions.

Attached files

Contact

Bret Nine(RFP Contact / Contract Officer)

[email protected]

(509) 634-2277

Key dates

Opened
10/15/2026
Questions due
10/16/2026
Closes
10/30/2026
Duration
3 years

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236115

Budget estimate

$900,000 – $1,500,000

Based on the size (≈1,600 sf) and the extensive site‑development, well, septic, and utility work, a comparable residential design‑build project in rural Washington typically ranges from $850 k to $1.6 M. The estimate considers material costs, labor, permitting fees (paid by the tribe), and contingency. Therefore, the contractor’s expected revenue is likely in the low‑nine‑hundred‑thousand to mid‑one‑million‑dollar range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Confederated Tribes of the Colville Reservation·Washington

Top match · 97%

F&W, Residential House, Resident Fish Hatchery - Sturgeon

Closes 10/30/2026Opened 10/15/2026

Confederated Tribes of the Colville Reservation·Washington

83% match

Traditional Territories Program, Concrete Slab Construction – Omak Fish and Wildlife Bullpen (Saint Mary’s Mission Campus)

Closes 11/26/2026Opened 10/23/2026

Confederated Tribes of the Colville Reservation·Washington

82% match

F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement

Closes 11/19/2026Opened 10/14/2026

Trout Unlimited·Wyoming

82% match

South Fork Ditch Creek Fish Passage Project

Closes 10/30/2026Opened 10/9/2026

Florida Fish and Wildlife Conservation Commission (FWC)·Florida

82% match

Spirit of The Wild Modular Home

Closes 10/19/2026Opened 9/2/2026

Confederated Tribes of the Colville Reservation·Washington

81% match

Keller Community Center Roof Replacement Engineering & Design

Closes 10/29/2026Opened 10/1/2026

Ohio Department of Natural Resources·Ohio

80% match

Magee Marsh Wildlife Area Shelter – Storage Facility

Closes 10/20/2026Opened 9/23/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement

Closes 11/19/2026Opened 10/14/2026

Confederated Tribes of the Colville Reservation·Washington

80% match

Keller Community Center Roof Replacement Engineering & Design

Closes 10/29/2026Opened 10/1/2026

U.S. Department Of The Interior·Alaska

79% match

Y--AK FWS AK PEN NWR REPLACE COLD STRG 5

Closes 11/4/2026Opened 10/14/2026

Fort Pierce Utilities Authority·Florida

79% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Agriculture·Wyoming

79% match

4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Closes 10/27/2026Opened 9/30/2026

Arizona Salt River Pima-Maricopa Indian Community·Arizona

79% match

Ṣegoi Oidag Subdivision Site Civil and Infrastructure - ECS-27-003

Closes 11/6/2026Opened 9/23/2026

Navajo Tribal Utility Authority·Arizona

78% match

NTUA PUMPHOUSE CONSTRUCTION FOR HOUCK WELL #4

Closes 10/19/2026Opened 5/25/2026

U.S. Department Of Defense·Kentucky

78% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of The Interior·New Mexico

78% match

Y--Hickman Wildlife Water Catchment and Pipe Fence

Closes 10/22/2026Opened 8/31/2026

Santa Clara Valley Water District·California

78% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

California Department of Water Resources·California

77% match

RFQ/P Progressive Design-Build Project Reference No. DB-2026-01 - Kane Spring Project

Closes 12/4/2026Opened 8/27/2026

Oregon Confederated Tribes of Siletz Indians·Oregon

77% match

Siletz Head Start Building and Shed Repairs

Closes 10/28/2026Opened 10/7/2026

U.S. Department Of Health And Human Services·Washington

77% match

iHouse Apartment Construction

Closes 10/22/2026Opened 7/15/2026

Maryland Department Of General Services·Maryland

77% match

P-055-260-010 Tuckahoe State Park New Bathhouses

Closes 10/21/2026Opened 9/9/2026

U.S. Department Of Agriculture·Utah

77% match

GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

Closes 10/28/2026Opened 10/9/2026

Lower Platte North Natural Resources District·Nebraska

77% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026

Cherokee Nation·Oklahoma

77% match

Solicitation 2026-001-055- New Construction-Cherokee, Delaware, Mayes, Rogers, and Sequoyah Co.

Closes 10/23/2026Opened 9/25/2026

Lower Platte North Natural Resources District·Nebraska

77% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026