This requirement modernizes and restores the Kent’s Lake Campground within the Fishlake National Forest. The work includes demolition, road realignment, grading, drainage improvements, installation of water and sewer infrastructure, concrete sidewalks, curbstops, culverts, signage, fencing, rock‑retaining walls, and new family‑unit pads and tent pads. The contractor must adhere to Davis‑Bacon prevailing‑wage rates, provide a detailed quality‑control plan, obtain an NPDES permit, and meet extensive environmental and safety standards. The contract is set‑aside for small businesses and will be awarded on a lowest‑price‑technically‑acceptable basis.
• Base‑bid scope: 150‑day schedule for road reconstruction, utility installation, site grading, concrete work, signage, and campground amenities.
• Optional‑bid scope: additional sidewalk, picnic shade structure, extra water hydrants, and extra rock‑walling, each priced separately.
• Mandatory compliance: Davis‑Bacon wage determination, NPDES permit, sediment‑and‑erosion control plan, and strict equipment pressure‑wash and fire‑tool requirements.