Description
The Las Vegas Valley Water District is seeking bids for the construction of a pipeline and associated infrastructure. The project involves installing approximately 18,000 linear feet of 42-inch-diameter mortar-lined, tape-wrapped, and mortar-coated steel pipe, as well as communications infrastructure and water pipeline appurtenances. The project also includes construction/installation of four 42-inch butterfly valves, a sacrificial anode cathodic protection system, and other water pipeline appurtenances. The Engineer's Estimate for the project is $28,203,225.00. Key aspects of the project include:
• Installation of pipeline and associated infrastructure
• Construction/installation of valves and cathodic protection system
• Electrical/communications improvements for the new valves
• Removal and replacement of an existing gate valve
The project is located southwest of Las Vegas Boulevard, within the Clark County and City of Henderson jurisdictions.
Attached files
The solicitation documents live at the source — open the bid source above to download them.