Will Rogers Elementary School’s Building H will undergo a complete HVAC system upgrade, replacing 34 existing units (22 rooftop packaged units and 12 split‑system units). The contractor must remove the old equipment, repair or replace roof curbs and sheet‑metal caps, provide all necessary structural supports, seismic attachments, ductwork, piping, electrical, and control connections, install new thermostats and condensate drainage, and complete testing, balancing, and start‑up. The project is governed by California public‑contracting statutes, must comply with the Division of the State Architect (DSA) requirements, and requires adherence to a Community Workforce Agreement, prevailing‑wage rules, and bonding/security provisions. The work window is 58 calendar days from early November 2026 to early January 2027, with a built‑in 12‑14‑day rain‑delay allowance.
• Replace 34 HVAC units (22 rooftop, 12 split‑system) and associated controls.
• Perform demolition, roof curb repair/replacement, structural anchorage, duct and piping installation, electrical upgrades, and full system start‑up.
• Mandatory pre‑bid site walk on September 15 2026; bid submission due October 2 2026; performance & payment bonds equal to 100 % of contract value required.
• Must comply with DSA‑approved construction documents, California prevailing‑wage, CWA, and DVBE requirements, and provide a 1‑year warranty (plus optional extensions).