Description
The Howell Public Schools is seeking bids for the installation of structured cabling at the Southwest Elementary School. The project includes the provision of all labor, materials, and equipment necessary to complete the communications structured cabling systems scopes of work. The scope of work includes the installation of copper and optical fiber cabling, cabinets, racks, frames, and other related items. The project also requires the bidder to provide all necessary permits, fees, bonds, inspections, and testing. The bidder must also comply with E-Rate requirements and provide documentation and coordination to ensure compliance.
• The project requires the installation of structured cabling systems, including copper and optical fiber cabling.
• The bidder must provide all necessary permits, fees, bonds, inspections, and testing.
• The bidder must comply with E-Rate requirements and provide documentation and coordination to ensure compliance.
• The project includes the installation of cabinets, racks, frames, and other related items.
• The bidder must provide all necessary labor, materials, and equipment to complete the project.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Paul Pominville(Assistant Superintendent of Operations and Technology)
(517) 552-7558