The Wilcox County Board of Commissioners is soliciting sealed bids for a single‑prime contract to resurface and improve Gordon Road and Thompson Road under the FY 2026 LMIG program. The work includes placement of approximately 2,440 tons of 1.5‑inch Superpave asphalt concrete, 1,090 tons of Open‑Graded Interlayer, full‑depth replacement of roughly 5,851 square yards of pavement, and associated striping, rumble strips, and traffic control measures. Bids are to be submitted on a unit‑price basis; the bid opening is scheduled for 10:30 AM on November 5, 2026.
• Scope: Asphalt paving, interlayer installation, full‑depth pavement replacement, line striping, rumble strips, stop bar striping, traffic control.
• Quantity: ~2,440 tons asphalt, ~1,090 tons OGI, ~5,851 SY full‑depth replacement.
• Procurement: Sealed, unit‑price bids for a single prime contract.
• Location: Wilcox County, GA (Gordon Rd & Thompson Rd).
• Funding: Georgia DOT LMIG grant plus county funds.
• Bidding documents available from Still Waters Engineering (charge $300 PDF, $100 paper).
• Bid security required per Instructions to Bidders.