The City of Lincoln Water Production Facility is seeking qualified suppliers to provide hydrofluorosilicic acid (fluoride) for water fluoridation. The contract will cover approximately 250,000 lb of acid per year, delivered in 4,000‑5,000 gal loads to the Ashland Treatment Plant. Deliveries must meet strict concentration (23‑25 % by weight), color, and purity specifications, and adhere to detailed security and documentation protocols, including driver verification, wash‑out certificates, and chemical analysis reports. The supplier must have the capability to deliver within 7‑10 days of order, provide onsite unloading equipment, and coordinate with facility staff. Payment is based on actual poundage and acid content.
• Annual volume estimate: 250,000 lb of hydrofluorosilicic acid
• Required concentration: 23 %–25 % by weight
• Delivery size: 4,000‑5,000 gal per load, 7‑10 day lead time
• Delivery window: Mon‑Fri, 8 am‑3 pm, excluding city holidays
• Mandatory documentation: driver ID, truck ID, load seal, wash‑out certificate, chemical analysis, bill of lading, weigh ticket
• Payment: invoiced per pound, adjusted for actual acid content
• Contract location: Lincoln Water System Ashland Treatment Plant, Ashland, NE