The City of Denton is soliciting a qualified contractor to execute the Neighborhood 7B & 8A Reconstruction project on the south side of Denton. The scope includes rebuilding approximately 38,000 square yards of asphalt roadway, replacing 4,800 linear feet of 8‑inch and 12‑inch water mains, and relining 1,800 linear feet of 8‑inch sanitary sewer pipe across five neighborhood sites. The total project budget is about $9 million and covers construction, design, soft costs, and right‑of‑way acquisition. Bidders must submit a sealed competitive proposal with original hard‑copy bid bonds, complete required forms (past‑experience, key‑personnel resumes, unit‑price sheet, schedule, safety records), and attend an optional pre‑proposal meeting and site walk‑through on September 14, 2026. The final submission deadline is October 7, 2026, with a public opening later that day.
• Approx. 38,000 SY asphalt roadway reconstruction
• 4,800 LF of 8”/12” water main replacement
• 1,800 LF of 8” sanitary sewer relining
• Five separate neighborhood locations in Denton, TX
• Budget ~ $9 M (construction, design, soft costs, ROW)
• Mandatory hard‑copy bid bonds; electronic submission via Ionwave portal only
• Pre‑proposal meeting/site walk‑through (optional) on 9/14/2026
• Submission deadline 10/7/2026 2 PM CT; public opening 2:45 PM CT same day
• Evaluation based on personnel, past performance, schedule, safety record, and price (total cost of ownership)