The City of Garland is soliciting competitive sealed proposals for construction services to build and equip the Duck Creek Wastewater Treatment Plant (WWTP) Administration Operations Facility located at 750 Duck Creek Way, Sunnyvale, TX. The scope includes demolition of existing structures, site grading, utility installation, structural concrete work, architectural finishes, mechanical, electrical, plumbing, fire protection, technology systems, audiovisual integration, and site‑specific requirements such as ADA compliance, traffic control, and erosion control. The project budget is estimated at $6.8 million (including a $170 k contingency). Bids must be submitted electronically via the Ion Wave eBid system by the close date, with a pre‑bid meeting (optional) on 9/23/2026 and a site visit (optional) on 9/24/2026.
• Scope: Full design‑build construction of a new 1‑story, ~8,910 sf administrative building for WWTP operations.
• Trades: Concrete, structural steel, masonry, roofing, interior partitions, finishes, HVAC, plumbing, fire protection, low‑voltage cabling, AV, security cameras, and laboratory casework.
• Requirements: Compliance with IBC 2021, NEC 2020, IPC 2021, IMC 2021, Texas Accessibility Standards, and local public‑works specifications.
• Schedule: Issue date 9/17/2026; questions due 10/9/2026; bid deadline 10/22/2026.
• Budget: Approx. $6.8 M (including contingency).
• Evaluation: Most advantageous offer based on price and criteria.
• Mandatory permits, inspections, and coordination with City engineering and utility agencies required.