Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Vermont
  4. ›Closed bids
  5. ›Trout Brook Access Road Culvert Improvement Final Design

Franklin County Natural Resources Conservation District (FCNRCD)·Vermont

Trout Brook Access Road Culvert Improvement Final Design

Closes 8/4/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Franklin County Natural Resources Conservation District (FCNRCD) seeks proposals from engineering consultants to complete the final design for a culvert improvement project at Trout Brook in Berkshire, VT. The project involves replacing the existing culvert with a single 15' aluminum box culvert with wingwalls and baffles to improve aquatic organism passage and reduce the likelihood of washout during high flows. The consultant will be responsible for completing the final design, permitting, and construction oversight. • The project is located in Berkshire, VT, and the culvert is under an access road that crosses Trout Brook. • The existing culvert is a depth and velocity barrier to brook trout and needs to be replaced to improve aquatic organism passage. • The consultant will review the permits that have been issued for this project and complete any necessary edits to the plans. • The project has a budget, but the amount is not specified. • The consultant will be required to submit a memo summarizing AOP considerations in the plans and confirming that, if built, AOP will be established. • The project is expected to take approximately 6 months to complete.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lauren Weston

[email protected]

(802) 582-3133

Key dates

Opened
7/14/2026
Questions due
8/4/2026
Pre-bid meeting
8/1/2026
Closes
8/4/2026
Duration
6 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
73949

Budget estimate

$200,000 – $500,000

Based on the project description, the budget for this project is estimated to be between $200,000 and $500,000. This estimate is based on the scope of work, which includes the final design, permitting, and construction oversight for a culvert improvement project. The actual budget may vary depending on the consultant's proposal and the district's budget. Factors that may influence the budget include the complexity of the design, the number of permits required, and the cost of construction materials.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.