Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Closed bids
  5. ›Citywide Catch Basin Connecter Pipe Screen (CPS) Installation Project

City of Azusa·California

Citywide Catch Basin Connecter Pipe Screen (CPS) Installation Project

Closes 9/10/2026$100k – $250kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Azusa is seeking a qualified contractor to install Catch Basin Connector Pipe Screens (CPS) throughout the city. The contractor must supply all labor, materials, equipment, and incidentals to install the CPS devices, perform pre‑installation cleaning, and retrofit county‑owned catch basins in compliance with LACFCD standards. The scope includes confined‑space safety programs, coordination with transit agencies, and provision of Builder’s Risk Insurance. Bidders must submit a sealed bid by the deadline, include a 10 % bid bond, and be prepared to post prevailing wages and hold required licenses and certifications. • Install CPS devices city‑wide, including cleaning and retrofitting of existing catch basins. • Must maintain a confined‑space safety program, provide Builder’s Risk Insurance, and comply with CARB and prevailing‑wage requirements. • Bid submission requires a 10 % bid security, performance and payment bonds (100 % of contract price), and proof of Class A or C‑42 licensing, DIR registration, and CARB CRC for all subcontractors.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Vidal Villagomez Jr.(Primary Contact for Questions)

[email protected]

Key dates

Opened
10/2/2026
Questions due
8/31/2026
Closes
9/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237210
Solicitation №
NIB81926

Budget estimate

$100,000 – $250,000

The engineer’s estimate for the full scope is $700,000, which represents the city’s anticipated cost. Assuming a typical contractor markup of 15‑25 % on construction projects of this nature, the contractor’s net earnings could range from roughly $105,000 to $175,000. Additional revenue may be generated from ancillary items (e.g., staging, waste handling) captured in bid items 3 & 4, potentially raising the upper bound toward $250,000. Therefore, a reasonable budget estimate is $100k‑$250k, depending on cost control, material pricing, and efficiency.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Corona·California

Top match · 69%

Citywide Storm Drain Catch Basin Filters Phase II

Closes 10/14/2026Opened 9/14/2026

Town of Westwood·Massachusetts

67% match

Catch Basin Cleaning

Rolling / TBD closeOpened 9/9/2026

Town of Kershaw·South Carolina

66% match

Lynches River Waterline Bore

Closes 10/22/2026Opened 9/25/2026

City of Columbus Ohio·Ohio

66% match

Parsons Avenue Water Plant – CW112 Raw Water Line (Invitation for Bid)

Closes 11/4/2026Opened 10/6/2026

Minnesota Department of Administration·Minnesota

66% match

Storm Sewer Lining/Sealing – Elgin, MN C-Store

Closes 10/23/2026Opened 9/30/2026

City of Columbus Ohio·Ohio

65% match

Blueprint Miller‑Kelton Newton/Bedford Lateral Lining Project 1

Closes 10/14/2026Opened 9/16/2026

City of Charlotte·North Carolina

65% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

North Little Rock Wastewater·Arkansas

65% match

Faulkner Lake Bar Screen Installation Project

Closes 10/28/2026Opened 8/23/2026

City of Wheaton·Illinois

65% match

City of Wheaton Sewer Main Rehabilitation PRoject

Closes 10/26/2026Opened 10/9/2026

City of Wheaton·Illinois

65% match

City of Wheaton 2026 Sewer Main Rehabilitation Project

Closes 10/26/2026Opened 10/9/2026

Connecticut Town of Stratford·Connecticut

64% match

Diversion Chamber C Inlet Pipe Modifications -WPCF

Closes 10/16/2026Opened 9/17/2026

City of Opa-locka·Florida

64% match

Pump Station 11-C Bypass Control

Closes 10/30/2026Opened 9/25/2026

California Department of Transportation·California

64% match

Construct DPP infiltration areas, capture housing, bioswales, & MVPs.

Closes 11/10/2026Opened 9/28/2026

Mississippi

64% match

2026 Citywide Sewer CIPP Project

Closes 10/14/2026Opened 10/5/2026

City of Farmers Branch·Texas

64% match

2026 Water and Wastewater - Capital Improvements Plan - Phase #1

Closes 10/29/2026Opened 10/7/2026

City of Mansfield·Ohio

64% match

2026 Sanitary Sewer Inflow and Infiltration Reduction Project

Closes 10/27/2026Opened 10/9/2026

Connecticut Town of Stratford·Connecticut

64% match

Diversion Chamber C Inlet Pipe Modifications -WPCF

Closes 10/16/2026Opened 9/17/2026

Long Beach Utilities Department·California

64% match

Cherry Avenue Sewer Improvement Project (SC-0512)

Closes 10/14/2026Opened 9/18/2026

New York City Department of Environmental Protection·New York

64% match

82626B0065-BEDC - CSO-GC-SFS-OH-CP3 Construction of CSO Facilities for Gowanus Canal

Closes 11/17/2026Opened 9/30/2026

The City of Hammond, LA·Louisiana

64% match

MISCELLANEOUS DRAINAGE IMPROVEMENTS [FY 2027]

Closes 10/22/2026Opened 10/8/2026

City of Portsmouth·Virginia

64% match

RFP#332-27-YE PIPE REHABILITATION SERVICES

Closes 10/19/2026Opened 9/8/2026

City of Charlotte·North Carolina

64% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Torrance·California

64% match

Update the Sewer System Master Plan, CIP No. I-168

Closes 10/21/2026Opened 9/16/2026

California Department of Transportation·California

64% match

Trenchless culvert installation, cured-in-place pipeliner.

Closes 10/28/2026Opened 9/21/2026

City of Lowell·Arkansas

64% match

Construction of Todd Place CIPP Project – Storm Sewer Rehabilitation

Closes 10/13/2026Opened 9/27/2026