Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Excitation System Replacement, Table Rock Dam, White River Basin, T…
More bids in Arkansas →

U.S. Department Of Defense·Arkansas

Excitation System Replacement, Table Rock Dam, White River Basin, Taney County Missouri

Closes 9/18/2026$1M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corp of Engineers (USACE) Little Rock District (SWL) is seeking proposals for the replacement of the excitation system at Table Rock Dam, White River Basin, Taney County, Missouri. The project will be awarded as a firm-fixed price construction contract, and the magnitude of construction is estimated to be between $1M and $5M. The work shall be completed within 435 calendar days. The contractor will be required to comply with CMMC Level 1 (Self) requirements. • The project involves the replacement of the excitation system at Table Rock Dam. • The contractor must be registered with the System for Award Management (SAM) to submit a proposal. • The contractor must comply with CMMC Level 1 (Self) requirements. • The project will be evaluated via the Best Value - Trade Off method. • The contractor must submit the CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI during performance of the contract.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Shelby Henson

[email protected]

(501) 340-1249

Key dates

Opened
7/9/2026
Closes
9/18/2026
Duration
435 calendar days

Last updated

Details

Type
Request for Proposal
Industry
Energy and Utilities
NAICS
335312
Solicitation №
W9127S26RA070

Budget estimate

$1,000,000 – $5,000,000

The budget for this project can be estimated based on the magnitude of construction, which is between $1M and $5M. Considering the complexity of the project and the requirements for CMMC compliance, the budget is likely to be closer to the higher end of the range. The contractor will need to consider the costs of labor, materials, and compliance with CMMC requirements when submitting their proposal.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Arkansas

Top match · 74%

Pre-Solicitation Notice: Excitation System Replacement, Beaver Dam, White River Basin, Carroll County, Arkansas

Closes 10/21/2026Opened 10/7/2026

U.S. Department Of Defense·Oklahoma

70% match

Webbers Falls Excitation System Replacements

Closes 10/23/2026Opened 9/28/2026

Missouri Office of Administration·Missouri

68% match

Water Supply System - Bryant Creek State Park

Closes 10/22/2026Opened 10/8/2026

Tri Dam Project·California

68% match

Donnells Static Excitation Replacement

Closes 10/21/2026Opened 8/5/2026

U.S. Department Of Defense·Oklahoma

68% match

Webbers Falls Excitation System Replacements

Closes 10/23/2026Opened 10/9/2026

Missouri Department of Conservation·Missouri

67% match

White Ranch Conservation Area TSI

Closes 10/22/2026Opened 10/9/2026

U.S. Department Of The Interior·Colorado

66% match

CHOH 326202 Repair Historic Potomac River Dams 4 a

Closes 10/15/2026Opened 9/15/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

66% match

WTP Pipe Gallery Replacement - St. Charles County, MO

Closes 11/18/2026Opened 10/1/2026

North Carolina City of Raleigh·North Carolina

66% match

Neuse River Resource Recovery Facility BNR Basins MCC Replacement

Closes 10/21/2026Opened 9/16/2026

U.S. Department Of Defense·Kansas

65% match

Fall River Lake and Dam Damsite Park Lagoon Repair

Closes 10/20/2026Opened 9/30/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

65% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

U.S. Department Of Defense·Iowa

65% match

Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs

Closes 10/28/2026Opened 10/13/2026

U.S. Department Of Defense·Missouri

65% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

The University of Iowa·Iowa

65% match

UI Health Care - Pomerantz Family Pavilion - LL2 - Water Softener System Replacement

Closes 10/21/2026Opened 9/28/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

65% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

U.S. Department Of Agriculture·Missouri

65% match

Doniphan and Salem Drop Ceilings Installation

Closes 10/21/2026Opened 10/6/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

65% match

Western Transmission Main Phase 3C - St. Charles County, MO

Closes 10/15/2026Opened 8/25/2026

Texas Brazos River Authority·Texas

65% match

Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson Dam

Closes 10/20/2026Opened 8/17/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

64% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

Illinois DNR - Natural Resources·Illinois

64% match

DNR White Pines- Replace Vault Toilet Roofs

Closes 10/20/2026Opened 9/22/2026

Martin County Purchasing·Florida

64% match

Indian River Drive Water Service Replacements

Closes 10/14/2026Opened 9/10/2026

The State of Missouri Office of Administration·Missouri

64% match

Replace Nurse Call Systems - Missouri Veterans Homes - Statewide

Closes 10/27/2026Opened 9/23/2026

Lower Platte North Natural Resources District·Nebraska

64% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026

Facilities Management, Design, and Construction (Office of Administration)·Missouri

64% match

Walk-Through Weapons Detection System with an X-Ray Scanner Component

Closes 10/30/2026Opened 9/25/2026