Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Construction
  5. ›Precast Concrete Noise Wall, Moment Slab, TMS and Lighting…

Minnesota Department of Transportation·Minnesota

Precast Concrete Noise Wall, Moment Slab, TMS and Lighting Project

Closes 11/18/2026$500k – $1.5MInvitation for BidLogin requiredFee to access
Get bids like this by emailBid source

Description

This solicitation seeks a contractor to install a precast concrete noise barrier, associated moment slab, traffic management system (TMS) and lighting along Minnesota State Highway 169 in Hennepin County. The project covers the segment from Cedar Lake Road to approximately 0.07 miles south of West 16th Street, requiring coordination with existing roadway infrastructure and compliance with MnDOT standards. • Supply and install precast concrete noise wall sections. • Provide and construct a moment slab to support the barrier. • Install a traffic management system and roadway lighting. • Perform site preparation, grading, and utility coordination as needed. • Deliver all required documentation and warranty information.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tim Clyne(Project Contact)

[email protected]

(651) 775-1176

Key dates

Opened
10/21/2026
Closes
11/18/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Quest Number: 10414270

Budget estimate

$500,000 – $1,500,000

No contract value is disclosed. Based on typical highway noise‑wall installations in Minnesota, a segment of this length (approximately a few thousand feet) with associated lighting and TMS could range from roughly $0.5 million to $1.5 million, depending on material specifications, site conditions, and engineering services.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Minnesota Department of Transportation·Minnesota

Top match · 83%

260116 SP 3804-62

Closes 10/28/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

82% match

260134 SP 6222-196

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

82% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

80% match

260121 SP 5502-109

Closes 10/28/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

79% match

Grading, Bituminous Milling and Surfacing, ADA Improvements, TMS, Signals and Bridge No. 27020 and 27945

Closes 10/28/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

79% match

260120 SP 6908-72(EP) – Signal Fabrication Project

Closes 10/28/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

79% match

260126 SP 6918-105

Closes 10/28/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

79% match

260122 SP 4903-77

Closes 10/28/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

79% match

260125 SP 4901-82

Closes 10/28/2026Opened 10/16/2026

Massachusetts Department of Transportation·Massachusetts

79% match

616308 BOSTON Installation of Noise Barriers along I-90 between Market and Franklin Streets (Allst

Closes 11/17/2026Opened 9/28/2026

Minnesota Department of Transportation·Minnesota

79% match

260138 SP 8208-45

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

78% match

260124 SP 5380-152

Closes 11/4/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

78% match

260353 SP 4013-67

Closes 10/28/2026Opened 10/16/2026

Minnesota Department of Transportation·Minnesota

78% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026

Minnesota Department of Transportation·Minnesota

77% match

260139 SP 5605-23

Closes 10/28/2026Opened 10/16/2026

Mississippi

77% match

Construction of 0.189 Miles of Prestressed Concrete Bridge and Approaches on Liberty Road (Project No. SABP-48(01))

Closes 10/23/2026Opened 10/20/2026

Minnesota Department of Transportation·Minnesota

77% match

260143 SP 3403-84

Closes 10/28/2026Opened 10/16/2026

California Department of Transportation·California

76% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

Gilbert·Arizona

76% match

ST0980/TS1620 Higley Rd - Riggs to Stacey/Higley and Coldwater Signal

Closes 11/17/2026Opened 10/17/2026

California Department of Transportation·California

76% match

Modify existing drainage, replace lighting systems, and install TMS.

Closes 11/17/2026Opened 9/28/2026

Minnesota Department of Transportation·Minnesota

76% match

Signing (DBEN)

Closes 11/18/2026Opened 10/21/2026

Rice County·Minnesota

76% match

Culvert Replacement, Grading & Bituminous Surfacing

Closes 10/22/2026Opened 9/28/2026

Minnesota Department of Transportation·Minnesota

76% match

260145 SP 4208-68

Closes 11/18/2026Opened 10/21/2026

City of Milwaukee·Wisconsin

76% match

OFFICIAL NOTICE 68-1-2026 – Construction of Variable Thickness Asphalt Concrete Speed Humps, Pavement Grinding, Marking & Signage Installation

Closes 10/26/2026Opened 10/12/2026

Town of Westwood·Massachusetts

76% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026