Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Closed bids
  5. ›Rocky Reach Pump Frames

Chelan County PUD·Washington

Rocky Reach Pump Frames

Closes 9/22/2026$1M – $1.4MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The District is seeking a qualified steel fabricator to replace aging pump frames that support three PP7900 pumps at the Rocky Reach Plant. The scope includes design‑to‑spec fabrication of A36 steel frames, welding, surface preparation, coating, and delivery to the plant. This is a material‑focused solicitation targeting firms with experience in structural steel fabrication and coating. • Replace four stacked steel frames (three pump frames + one platform frame) for a fish‑dewatering system. • Fabricate frames to A36 steel specifications, including custom ISO 1161 locking corner connectors. • Perform welding, surface preparation, protective coating, and ship the completed frames to Rocky Reach Plant.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tammy Harn(Solicitation Contract Specialist)

[email protected]

(509) 661-4479

Key dates

Opened
9/1/2026
Closes
9/22/2026

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
332312
Solicitation №
26-15052

Budget estimate

$1,000,000 – $1,400,000

The solicitation lists a ball‑park estimate of $1,200,000 for the entire scope. Considering typical costs for steel fabrication, welding, coating, and delivery, a reasonable contractor profit range would be roughly 8‑15 % of total project cost, yielding an estimated earnings range of $1.0 M to $1.4 M. Factors influencing the final amount include material price fluctuations, coating specifications, and logistics to the Rocky Reach Plant.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Chelan County PUD·Washington

Top match · 74%

JFB Pump Frames

Closes 10/13/2026Opened 9/28/2026

City of Santa Monica·California

58% match

Pump Recirculation Tank and Standpipe Training Prop

Closes 10/26/2026Opened 10/12/2026

City of Tampa, Florida·Florida

58% match

26-C-00040 Pump Station Resiliency and Reliability Improvements Contract C

Closes 10/13/2026Opened 9/23/2026

U.S. Department Of Defense·Michigan

57% match

9-Mile Pump Station

Closes 10/15/2026Opened 7/14/2026

U.S. Department Of Defense·Texas

56% match

Mary Rhodes Pump Station: Emergency Streambank Erosion Protection

Closes 10/13/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

56% match

PUMP,ROTARY

Closes 10/14/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

55% match

43--PARTS KIT,ROTARY PUMP

Closes 10/22/2026Opened 10/13/2026

U.S. Department Of The Interior·California

55% match

J--LAKE25-101-CC LIFT STATION PUMP REPAIR

Closes 6/6/2029Opened 6/3/2025

Pennsylvania State Police·Pennsylvania

55% match

PSP Fitness Equipment

Closes 10/16/2026Opened 10/2/2026

City of Chesapeake, VA·Virginia

55% match

Pump Station 43 Replacement

Closes 10/27/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

55% match

43--PUMP,ROTARY

Closes 10/22/2026Opened 10/12/2026

City of Hickman, Nebraska·Nebraska

55% match

Hickman NE Reservoir and Pump Station

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

55% match

PUMP,ROTARY

Closes 10/23/2026Opened 10/9/2026

Georgia City of Thomson·Georgia

55% match

Westwood Pump Station Rehab

Closes 10/30/2026Opened 9/30/2026

City of Tampa, Florida·Florida

55% match

26-C-00038 Pump Station Resiliency and Reliability Improvements Contract A

Closes 10/13/2026Opened 9/23/2026

University of Southern Mississippi·Mississippi

55% match

Fluid Handling Components – Peristaltic Pumps and Accessories for Aquaculture Facility

Closes 10/23/2026Opened 10/5/2026

St. Mary Levee District·Louisiana

55% match

Pump Station No. 8 Equipment Installation and Building Refurbishment

Closes 10/14/2026Opened 9/16/2026

U.S. Department Of Defense·United States of America

55% match

43--PUMP,ROTARY

Closes 10/26/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

55% match

43--PUMP,ROTARY

Closes 10/20/2026Opened 10/6/2026

City of San Diego·California

55% match

Robb Field Gateway Path

Closes 10/29/2026Opened 9/28/2026

U.S. Department Of Defense·United States of America

54% match

43--PUMP SUBASSEMBLY,ROTAR

Closes 10/18/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

54% match

PUMP UNIT,ROTARY

Closes 11/5/2026Opened 10/6/2026

City of Chesapeake·Virginia

54% match

IFB 27-014-2230 Pump Station #43 Replacement

Closes 10/27/2026Opened 9/25/2026

South Florida Water Management District·Florida

54% match

CEPP EAA PHASE - EAA A-2 RESERVOIR S-636 SEEPAGE PUMP STATION, PALM BEACH COUNTY, FL

Closes 10/28/2026Opened 9/14/2026

U.S. Department Of Defense·United States of America

54% match

43--PARTS KIT,ROTARY PUMP

Closes 10/20/2026Opened 10/6/2026