The City of San Diego is seeking a qualified contractor to construct the Robb Field Gateway Path, an ADA‑compliant pedestrian walkway and bike path upgrade in the Robb Field / Mission Bay Park area. The work includes demolition of existing non‑code infrastructure, site grading, new storm‑drain installation, a retaining wall, pedestrian lighting, a drinking fountain, irrigation system upgrades, landscaping with native drought‑tolerant species, and protection of existing utilities and trees. The contract is a lump‑sum award with a 220‑working‑day schedule, includes mandatory SLBE/ELBE participation, and requires compliance with prevailing‑wage, environmental monitoring, CARB diesel‑fleet regulations, and a Project Labor Agreement.
• Construct ADA‑compliant walkway, bike path, and extend existing pathway.
• Perform site work: demolition, grading, storm‑drain, retaining wall, lighting, drinking fountain, irrigation, and landscaping.
• Provide required bonds, insurance, and certifications (SLBE/ELBE, debarment, PLA, etc.) and adhere to environmental monitoring and CARB requirements.
• Mandatory pre‑bid meeting on 7 Oct 2026; bid due 2 PM 29 Oct 2026; contract value estimated at $1.524 M.