Description
The Manhattan‑Ogden Public Schools USD #383 is soliciting sealed bids for the design and construction‑document preparation of a new Video Production Control Room (C114A) at Manhattan High School. The scope includes architectural, structural, and building‑systems design, selective demolition of existing conditions, and coordination of all new construction elements necessary for a fully functional media production facility. Bids are due May 26, 2026, with a pre‑bid site meeting on May 12, 2026 (optional). The project must reach substantial completion by July 17, 2026 and final completion by July 24, 2026.
• Design of a dedicated video‑production control room, including interior finishes, equipment layout, and system integration.
• Selective demolition of existing spaces and preparation of construction documents for new build‑out.
• Coordination with school facilities, structural, mechanical, electrical, and IT disciplines to ensure seamless integration into the existing high‑school infrastructure.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Clint Hibbs(Architect)