Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Kansas
  4. ›Closed bids
  5. ›USD 383 MHS Video Production Control Room C114A

Manhattan-Ogden Public Schools USD #383·Kansas

USD 383 MHS Video Production Control Room C114A

Closes 5/26/2026$150k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Manhattan‑Ogden Public Schools USD #383 is soliciting sealed bids for the design and construction‑document preparation of a new Video Production Control Room (C114A) at Manhattan High School. The scope includes architectural, structural, and building‑systems design, selective demolition of existing conditions, and coordination of all new construction elements necessary for a fully functional media production facility. Bids are due May 26, 2026, with a pre‑bid site meeting on May 12, 2026 (optional). The project must reach substantial completion by July 17, 2026 and final completion by July 24, 2026. • Design of a dedicated video‑production control room, including interior finishes, equipment layout, and system integration. • Selective demolition of existing spaces and preparation of construction documents for new build‑out. • Coordination with school facilities, structural, mechanical, electrical, and IT disciplines to ensure seamless integration into the existing high‑school infrastructure.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Clint Hibbs(Architect)

[email protected]

Key dates

Opened
5/1/2026
Pre-bid meeting
5/12/2026
Closes
5/26/2026
Duration
7 days

Last updated

Details

Type
Invitation for Bid
Industry
Architecture
NAICS
541310
Solicitation №
26-1153

Budget estimate

$150,000 – $300,000

The solicitation does not disclose the contract value. Based on the scope—preparing comprehensive design and construction documents for a specialized educational media facility—and typical fees for similar school‑level projects, a reasonable estimate for the architect’s fee would range between 0.4% and 0.8% of the construction cost. Assuming a modest construction budget of $20 M‑$40 M, the design fee would fall roughly between $80,000 and $320,000. Therefore a ball‑park budget estimate is $150,000 – $300,000, reflecting the likely fee schedule and project complexity.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.