Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Hampshire
  4. ›Closed bids
  5. ›NH Seacoast Greenway Rail to Trail

City of Portsmouth·New Hampshire

NH Seacoast Greenway Rail to Trail

Closes 6/25/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Portsmouth is seeking a qualified firm to provide engineering and design services for two trailhead facilities on city-owned parcels, which will connect users to the New Hampshire Seacoast Greenway. The project includes paved parking areas, concrete pads and enclosures for portable restrooms, bicycle racks, trailhead kiosks, and wayfinding signage, landscaping, and a seating area. The selected consultant will be responsible for tasks such as wetland flagging and survey, engineering study and conceptual plan, preliminary design, easement plans, environmental and cultural documentation, and permitting. The consultant must comply with all applicable HUD grant requirements, policies, and guidelines. Key aspects of the project include: • Two trailhead facilities on city-owned parcels • Paved parking areas, concrete pads, and enclosures for portable restrooms • Bicycle racks, trailhead kiosks, and wayfinding signage • Landscaping and a seating area • Compliance with HUD grant requirements and guidelines • Wetland flagging and survey, engineering study, and conceptual plan • Preliminary design, easement plans, and environmental and cultural documentation

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Christine Sproviero

[email protected]

(603) 380-4805

Key dates

Opened
6/5/2026
Questions due
6/16/2026
Closes
6/25/2026

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
28-26-RFP

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and the tasks involved. The project includes engineering and design services, environmental and cultural documentation, and permitting, which can be time-consuming and require significant resources. The City of Portsmouth has received funding for this project through the New Hampshire Housing and Urban Development (HUD) grant program, which may have specific requirements and guidelines for the project. Assuming the project requires a significant amount of engineering and design work, environmental and cultural documentation, and permitting, the budget can be estimated to be in the range of $200,000 to $500,000. This estimate is based on the assumption that the project will require a team of engineers, designers, and environmental consultants to complete the tasks involved.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Portsmouth·New Hampshire

Top match · 69%

Portsmouth Seacoast Greenway Trailheads Design and Engineering

Closes 10/19/2026Opened 8/24/2026

City of Keene·New Hampshire

64% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Green Bay·Wisconsin

63% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Massachusetts City of Salem·Massachusetts

63% match

27-19-PLAN Danvers-Peabody-Salem Rail Trail Feasibility Study

Closes 10/14/2026Opened 9/9/2026

City of Keene·New Hampshire

62% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Illinois Natural Resources·Illinois

61% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Green Bay·Wisconsin

61% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

60% match

609204 BELMONT FAP No. STP/CMQ/TAP-0034(035)X Community Path, Belmont Component of the MCRT (Phase

Closes 11/10/2026Opened 9/14/2026

Upstate Greenways and Trails Alliance·South Carolina

60% match

Swamp Rabbit Trail Orange Line Connection Feasibility Study

Closes 10/23/2026Opened 9/21/2026

New Jersey Turnpike Authority (Njta)·New Jersey

60% match

Contract No. P200.831 Guide Rail Improvements, Milepost 160.0 to 172.4

Closes 10/19/2026Opened 9/23/2026

City of Green Cove Springs·Florida

60% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Maryland Department of Natural Resources·Maryland

60% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/2/2026Opened 10/9/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

60% match

Avenue of the Pines Trail Reroute at Saratoga Spa State Park

Closes 10/15/2026Opened 9/17/2026

Massachusetts Department of Transportation·Massachusetts

60% match

607420 NATICK FAP No. HIP(NGB)-003S(965)X Bridge Replacement, N-03-012, Boden Lane over CSX/MBTA

Closes 10/27/2026Opened 9/8/2026

Massachusetts Town of Lynnfield·Massachusetts

60% match

Willis Wood Trail Development

Closes 10/15/2026Opened 10/1/2026

Massachusetts Department of Transportation·Massachusetts

59% match

610544 PEABODY FAP No. CMQ/STP/TAP-0034(034)X Multi-Use Path Construction of Independence Greenway

Closes 10/14/2026Opened 8/3/2026

City of Harrisonburg·Virginia

59% match

Northend Greenway (NEG) Brookside ITB (2027005-PW-B)

Closes 10/15/2026Opened 9/1/2026

County of Ocean·New Jersey

58% match

Construction of Barnegat Branch Trail Maintenance Contract 2026, Township of Lacey

Closes 10/14/2026Opened 9/23/2026

State of Hawaii Department of Transportation·Hawaii

58% match

HWY-ORL-2026.01 VEGETATION MGMT. AND GENERAL RAILWAY MAINT. ROW

Closes 11/6/2026Opened 6/15/2026

Connecticut Office of DOT - Rail·Connecticut

58% match

RAIL PROPERTY MANAGEMENT, LEASING, AND ASSET DEVELOPMENT

Closes 10/30/2026Opened 8/27/2026

Maryland Department of Natural Resources·Maryland

58% match

Battlefield Trail Ph. 2 Construction at Gathland State Park

Closes 10/28/2026Opened 9/22/2026

Virginia Department of Transportation·Virginia

58% match

B02_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026