The City of Sylvania is soliciting sealed bids for the 2026 Sylvania Street Improvements project, which involves resurfacing approximately 3.42 miles of municipal streets with asphalt, including milling, tack coat, patching, leveling, overlay, and striping on several named roadways. The contractor must supply all materials, equipment, and labor, complete the work within a 90‑day calendar schedule, and provide performance and payment bonds equal to 100 % of the contract price. Bids are due by October 1, 2026, 2 PM at City Hall; a bid bond of at least 10 % of the base bid is required. Funding comes from TSPLOST and the City.
• Scope: Asphalt resurfacing, milling, tack coat, patching, leveling, overlay, striping for ~3.42 mi of streets (Friendship Rd, Holly Rd, WT Sharpe Dr, access to Friendship Cemetery, West Frontage Rd).
• Schedule: 90 calendar days from award; bids open Sep 10 2026, close Oct 1 2026.
• Bonds: 10 % bid bond; 100 % performance & payment bonds required.
• Funding: TSPLOST + City of Sylvania.
• Procurement: Sealed bid, invitation for bid, must comply with E‑Verify.
• Documents: Plans/specs available from Parker Engineering for $100 per full‑size set.