Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Missouri
  4. ›Closed bids
  5. ›BRUSH CREEK TRAIL FROM HAMPTON TO NW 76TH STREET

Platte County·Missouri

BRUSH CREEK TRAIL FROM HAMPTON TO NW 76TH STREET

Closes 9/21/2026$300k – $600kRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Platte County, Missouri is seeking a qualified consulting engineering firm to provide professional design and limited construction‑administration services for the Brush Creek Trail extension (approximately 2 mi) between Hampton Road and NW 76th Street. The consultant will develop conceptual through construction‑ready drawings, conduct hydrologic and hydraulic analyses, design three pedestrian‑bridge structures, prepare FEMA “No‑Rise” compliance documentation, and support permitting, utility coordination, and shop‑drawing review. The effort includes project management, data collection, surveying, geotechnical coordination, cost estimating, and preparation of a full PS&E package for the bridge components. Submissions consist of a Letter of Interest (≤ 6 pages) and a Statement of Qualifications (≤ 10 pages).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Wes Minder

[email protected]

(816) 200-7443

Key dates

Opened
8/18/2026
Questions due
9/14/2026
Closes
9/21/2026

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
RFQ 2026-002

Budget estimate

$300,000 – $600,000

The County estimates total construction cost at about $6 million. Engineering design and related consulting services typically represent 5‑10 % of construction cost for bridge‑focused transportation projects. Assuming a 7 % design fee yields an estimated contract value between $300,000 and $600,000, depending on the final scope, level of detail, and any additional environmental or permitting services required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Department of Transportation·Virginia

Top match · 64%

B23_2026 PROPOSED TRAIL

Closes 10/28/2026Opened 9/9/2026

Virginia Department of Transportation·Virginia

62% match

B02_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026

City of Hampton·Virginia

62% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

Massachusetts Town of Lynnfield·Massachusetts

62% match

Willis Wood Trail Development

Closes 10/15/2026Opened 10/1/2026

Virginia Department of Transportation·Virginia

61% match

B05_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026

Iowa City·Iowa

61% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 10/21/2026Opened 9/29/2026

James City County·Virginia

61% match

Landing Circle Stream Restoration

Closes 10/28/2026Opened 9/23/2026

City of Green Cove Springs·Florida

61% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

City of Hampton·Virginia

61% match

ITB 27-03TM Landscape & Turf Maintenance

Closes 6/1/2027Opened 6/3/2026

Georgia Cobb County Department of Transportation·Georgia

60% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Green Bay·Wisconsin

60% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Green Bay·Wisconsin

60% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Smithville·Missouri

60% match

RFP 26-15 Riverwalk Trail - Smithville, MO

Closes 10/27/2026Opened 9/28/2026

City of Panama City·Florida

60% match

Professional Services for Panama City for Frankford Avenue Trail

Closes 10/21/2026Opened 9/17/2026

County of Dorchester, SC·South Carolina

60% match

Ashley River Scenic Blue Trail Obstruction Clearing

Closes 10/21/2026Opened 9/23/2026

Missouri Department of Transportation·Missouri

60% match

TAP-3302(449), KC District, City of Smithville, construction of a multiuse trail in the community.

Closes 10/27/2026Opened 9/29/2026

Texas Williamson County·Texas

59% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

Columbus Consolidated Government·Georgia

59% match

Dragonfly Trail - River Road Segment

Closes 10/21/2026Opened 8/18/2026

County of Ocean·New Jersey

59% match

Construction of Barnegat Branch Trail Maintenance Contract 2026, Township of Lacey

Closes 10/14/2026Opened 9/23/2026

Missouri Department of Transportation·Missouri

59% match

TAP-3302(450) KC District, City of Smithville. construction of a multiuse trail in the community.

Closes 10/27/2026Opened 9/29/2026

City of Cincinnati·Ohio

59% match

Bramble Park Trail

Closes 10/28/2026Opened 7/10/2026

City of Keene·New Hampshire

59% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Hampton·Virginia

59% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 10/2/2026

City of Charlotte·North Carolina

59% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028